My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R92-80 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1992
>
R92-80 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:45:32 PM
Creation date
7/22/2016 2:45:31 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R92-80
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT CITY PROJECT 8011 LIME SLUDGE EFFLUENT PIPING REHABILITATION - NORTH WATER TREATMENT PLANT
Approved Date
5/18/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� - s��, ��. <br /> R. R. #2 - BOX 35 - DECATUR, ILLINOIS 62521 - (217) 428-4381 <br /> May 11 , 1992 <br /> City of Decatur <br /> 6�ater Department <br /> Attention: John 9nith <br /> 1155 South Martin Luther King <br /> Decatur, Illinois 62521 <br /> Ref: Cleaning lines at the north water treatme�Zt plant <br /> Nir. 9nith: <br /> Bodine Sewer, Inc. is pleased to quote the water department the price for the <br /> cleaning of pipes you show�ed us during a visit o� May 6, 1992 at the north water <br /> treatment plant. The job w�uld consist of cleaning the pipes from the lawer <br /> basement area out to the basins arid would take about one week working five ten <br /> hour days. We wc�uld need the basins on the east side of the building and the <br /> pipe inside the building drained. We would need to have a lock out policy used <br /> on the valves pertaining to our job. Attached is our oompany lock out policy. <br /> The lines w�ould be cleaned by a hydro blaster using 12,500 PSI machine cleaning <br /> lime and sludge o�t of the lines. We would also use a vacuum truck to keep the <br /> sludge cleaned up as we are hydro blasting. Any material w�e vacuLun up would be <br /> dumped on site. FYom time to t.ime, w�e wnuld have one of our employees check the <br /> lines for the lime being removed fran the hydro blasting. This is with the <br /> understanding that the pipe will not be 100� cleaned when the job is completed. <br /> During our inspection of the job, we discussed with you the oost of doing this kind <br /> of a project and not knowing haw it was going to work, that the city might want <br /> to do it on an hourly rate instead of a oontract price. Therefore, I've included <br /> that rate also. Contract price would be $17,760.00 or the hourly rate of $295.00. <br /> Thank you for letting us give you a quote on this project and if there are any <br /> questions, please feel free to call and discuss the project. <br /> Sinc ely, <br /> � <br /> ���� ���' <br /> ack A. Bodine <br /> Vice-President <br /> JAB/slf <br />
The URL can be used to link to this page
Your browser does not support the video tag.