Laserfiche WebLink
6. The City will assume, at it ' s expense, all cost to <br /> repair or replace all parts and components normally consumed in <br /> day-to-day operations such as : tires , tubes , tire repairs , <br /> lubricating oil, filters of all types, grease, fuel, anti-freeze, <br /> cutting edges, batteries , headlights , glass breakage, wire rope, <br /> belts , brake linings , cleaning and painting. <br /> 7 . Capitol shall have a parts availability policy to <br /> supply the City with new parts within 48 hours (excluding <br /> Saturday, Sunday and holidays ) or will furnish the parts upon <br /> request at no cost . Parts covered in this guarantee are those <br /> new parts required for normal repairs and maintenance necessary <br /> to keep the machine operating in a day-to-day operation. <br /> 8. The City will maintain equipment in accordance with <br /> normal published manufacturer' s recommendations. <br /> 9 . Capitol has the right to inspect equipment during <br /> normal working hours at the City and make recommendations for <br /> repairs , improved maintenance, etc. , in keeping with the <br /> requirements stated by the manufacturer in the shop manual for <br /> the maintenance and repair of the piece of equipment. <br /> 10. Capitol will be fully responsible for the total cost of <br /> all repairs (other than in Paragraph 6 ) to the equipment on the <br /> following Power Train items , in excess of the guaranteed maximum <br /> cost of repairs (as indicated on Exhibit A) for the time of <br /> operation in hours , or period of time in years , from the date of <br /> delivery, whichever occurs first ( as indicated on the Exhibit A) . <br /> Engine, torque converter, transmission, drive shafts , universal <br /> joints , differential, transfer gear group, drive axles , drive <br /> pumps, drive motor, pinion and bevel gear, steering clutches , <br /> steering brakes , final drive gear trains (up to, but not <br /> including the sprockets or tires ) , fuel pump and turbocharger. <br />