My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R91-142 FOR IMPROVEMENT BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
COD
>
City Clerk
>
RESOLUTIONS
>
1991
>
R91-142 FOR IMPROVEMENT BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 2:15:54 PM
Creation date
7/25/2016 2:15:53 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R91-142
Res Ord Title
FOR IMPROVEMENT BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
Approved Date
9/30/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> F .A.U. Route 7429 (Fairview Avenue) <br /> . , ' Section 127R,130R-2 ,127BR,130SBR <br /> City of Decatur <br /> Macon County <br /> Agreement No. J-591036 <br /> Contract No. 90112 <br /> EXHIBIT "B" (Contd. ) <br /> Sidewalk from South of Sunset <br /> Avenue, south to connect to <br /> egisting sidewalk system $ 40 ,618.00 <br /> City Participation (SOX) X 0 .50 <br /> 20 ,309 .00 <br /> Embankment to widen slopes for <br /> sidewalk south of pro�ect limits $ 2 ,751 .00 <br /> City Participation (100X) X 1 .0 <br /> 2 , 751 .00 <br /> SUMMARY: <br /> Traffic Signal at Lincoln Park Road � 9 ,621 .15 <br /> Traffic Signal at Main Street $ 10 ,500 .00 <br /> Traffic Signal at Eldorado Street � 5 ,250 .00 <br /> Sub Total 25 ,371 .15 <br /> Engineering Cost (15X) X 1 .15 <br /> Total Estimated Traffic Signal <br /> Participation $ 29 ,176 .82 * <br /> * Actual cost will be based on contract unit prices and final <br /> quantities; however the CITY' S cost for the traffic signals at <br /> Lincoln Park Road, Main Street, and Eldorado Street shall not <br /> ezceed $36 ,471.03 which represents 125X of the estimated <br /> construction and engineering costs for traffic signals escluding <br /> pre-emption. <br /> SOX CITY ITEMS: <br /> Sidewalk South of Sunset Avenue � 20 ,309 .00 <br /> Engineering (15X) R 1 .15 <br /> Total Estimated SOX City Items 23 ,355 .35 ** <br /> 100% CITY ITEMS: <br /> Fire Station Pre-emption Equipment � 1 ,240 .60 <br /> Embankment for Sidewalk south of <br /> Sangamon River $ 2 ,751 .00 <br /> Sub Total 3 ,991 .60 ** <br /> Engineering Cost (15X) R 1 .15 <br /> Total Estimated 100X City Items 4 ,590 .34 <br /> ** Actual cost will be based on contract unit prices and final <br /> quantities shall be used in the final division of costs for <br /> billing and final reimbursement . <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.