Laserfiche WebLink
� • <br /> . • <br /> Project............................ 9170 �� � � � � � <br /> Miscellaneous Storm��Alternate II �CHARLES T. RHODES �SEWER, INC �GOODMAR, 1NC. �WILLOUGHBY & DUPREE � <br /> Drain Improvements ��Aluninized �1357 6061SHIER LANE �P. 0. BOX 4569 �7295 STATE HIGHNAY S �1520 RT. 54 E � <br /> �� �DECATUR, IL 62521 �DECATUR, IL 62525 �MT. ZION, IL 62549 (CLINTON, IL 61727 � <br /> Bid Date........................... June 11, 1991 �� � � � � � <br /> �� � � � � � <br /> Time............................... 10:00 A.M. �� � � � � � <br /> �� � � � � � <br /> �� � � ( � � <br /> �� � � � � � <br /> - ------------------------------------------------------------------------------------------ <br /> PAT 1TEM � UNIT � GTY �� UNIT � TOTAL � UNIT � TOTAL � UNIT � TOTAL � UNIT I TOTAL � UN1T � TOTAL � <br /> � � �� PRICE � I PRICE � � PRICE I I PRICE I � PRICE � I <br /> - -- ----------------------------------------------------------------- <br /> *24" Storm Sewer Pipe ( Lf � 1,274 �� 20.00 � 25,480.00 � 22.50 � 28,665.00 � 28.00 � 35,672.00 � � � ( � <br /> 12" CMP � LF � 101 �� 18.00 � 1,878.00 � 16.95 � 1,711.95 � 18.00 � 1,818.00 � � � � � <br /> *36" Storm Sewer Pipe � LF � 360 �� 25.00 � 9,000.00 � 32.00 � 11,520.00 � 44.00 � 15,840.00 � � � � � <br /> 4�� PVC Pipe � LF � 20 �� 10.00 � 200.00 � 12.00 � 240.00 � 12.00 � 240.00 � � � � � <br /> *18'� Storm Sewer Pipe � LF � 45 �� 25.00 � 7,125.00 � 24.00 � 1,080.00 � 26.00 � 7,170.00 � � � � � <br /> *18" End Section � EACH � 1 �� 90.00 � 90.00 � 107.00 � 107.00 � 200.00 � 200.00 � � � � � <br /> 12" Metal End Section � EACN � 1 �� 75.00 � 75.00 � 86.00 � 86.00 � 100.00 � 700.00 � � � � � <br /> Structure #1 � LS � 1 �� 2700.00 � 2,700.00 � 650.00 � 650.00 � 3100.00 � 3,100.00 � � � � � <br /> *4� Manhole Ty 1, Closed Lid � EACH � 3 �� 1200.00 � 3,600.00 � 3000.00 � 9,000.00 � 1200.00 � 3,600.00 � � � � � <br /> *4� Manhole Grate Ty 8, SP/AP � EACH � 4 �� 1400.00 � 5,600.00 � 2750.00 � 11,000.00 � 1400.00 � 5,600.00 � � � � � <br /> Structure #2 � LS � 7 �� 3500.00 � 3,500.00 � 950.00 � 950.00 � 3700.00 � 3,700.00 � � � � � <br /> CA-6 Crushed Stone � TON � 70 �� 17.00 � 170.00 � 35.00 � 350.00 � 25.00 � 250.00 � � � � � <br /> Class I Asphalt � TON � 5 �� 100.00 � 500.00 � 770.00 � 550.00 � 85.00 � 425.00 � � � � � <br /> 36" End Section w/Steel Track Rack � EACH � 1 �� 940.00 � 940.00 � 1760.00 � 1,160.00 � 7200.00 � 1,200.00 � � � � � <br /> Concrete Paved Ditch � LF � 330 �� 48.00 � 75,840.00 � 49.39 � 16,298.70 ( 28.00 � 9,240.00 � � � � � <br /> *42�� Storm Sewer Pipe � LF � 170 �� 38.00 � 6,460.00 � 42.00 � 7,140.00 � 54.00 � 9,180.00 � � � � ( <br /> 42�� End Section � EACH ( 1 �� 1040.00 � 1,040.00 � 875.00 � 875.00 � 1000.00 � 1,000.00 � � � � � <br /> � � �) � � � � � � � � � � <br /> � � �� � � � � � � � � � � <br /> � � �� � � � � � � � � � � <br /> � � �� � � � � � � � � � � <br /> ( � �� � � � � � � � � � � <br /> � � �� � � � ( � � � � � � <br /> � � �� � � � � � � � � � � <br /> � � �� � � ( � � � � � � � <br /> � � �� � � � � � � � � � � <br /> ___________________________________�_________�_________��______________________�______________________�______________________�______________________�______________________� <br /> TOTAL BID (AS CORRECTED) I I I� 78,138.00 I 91,383.65 � 92,335.00 � NO BID � NO BID � <br /> Percent Over or (Under) ENGINEER'S ESTIMATE 16.95 18.17 (100.00) (100.00) <br /> * Items thay may be bid uith choice of different materials. <br />