Laserfiche WebLink
Project............................ 9107 �� � � � <br /> STREET RESURFACING ��ENGINEER'S ESTIMATE �DUNN COMPANY �ILLINOIS VALLEY PAVING� <br /> - CONVENTIONAL II I�4 N MERCER �P. 0. BOX 648 � <br /> �� �DECATUR, 1L 62522 �DECATUR, IL 62525 � <br /> Bid Date........................... JUNE 10, 1991 �� � � � <br /> �� � � � <br /> Time............................... 10:30 A.M. �� � � � <br /> �� � � � <br /> �� � � � <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> PAY ITEM � UN[T � QTY �� UNIT � TOTAI � UNIT � TOTAL � UNIT � TOTAL � <br /> � � �� PRICE � � PRICE � � PRICE � � <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> Area Reflective Crack Control � S.Y. ( 50,000 �� 0.70 � 35,000.00 � 0.75 � 37,500.00 � 0.79 � 39,500.00 � <br /> Bituminous Concrete Surface � � �� � � � � � � <br /> Course, Class I � TONS � 20,000 �� 33.50 � 670,000.00 � 34.75 � 695,000.00 � 35.25 � 705,000.00 � <br /> Leveling Binder (Machine Method) � TONS � 3,600 �� 33.50 � 120,600.00 � 34.75 � 125,700.00 � 35.25 � 726,900.00 � <br /> Bituminous Materials RC70 � � �� � � I I � ( <br /> (Prime Coat) � GALS � 14,000 �� 0.60 � 8,400.00 � 0.80 � 71,200.00 � 0.90 � 12,600.00 � <br /> Bituninous Materials AC85-100 � � �� � � � � I � <br /> (Prime Coat) � GALS � 12,000 �� 1.00 � 12,000.00 � 1.10 � 13,200.00 � 1.12 � 13,440.00 ( <br /> Prime Coat Aggregate � TONS � 350 �� 10.00 � 3,500.00 � 11.00 � 3,850.00 � 12.50 � 4,375.00 ( <br /> Pavement Removal, Surface Coat � S.Y. � 3,000 �� 6.40 � 19,200.00 � 6.75 � 20,250.00 � T.00 � 21,000.00 � <br /> Valve Box � EACH � 3 �� 130.00 � 390.00 � 140.00 � 420.00 � 150.00 � 450.00 � <br /> Manhole Frame 8 lid, Type 1 � EACH � 3 �� 175.00 � 525.00 � 200.00 � 600.00 � 190.00 � 570.00 � <br /> Valve eox to be Adjusted (Asphalt) � EACH � 145 �� 75.00 � 10,875.00 � 85.00 � 12,325.00 � 85.00 � 12,325.00 � <br /> Valve Box to be Adjusted (Concrete)� EACH � 3 �� 150.00 � 450.00 � 175.00 � 525.00 � 175.00 � 525.00 � <br /> Manhole to be Adjusted (Asphalt) � EACH � 3 �� 730.00 � 390.00 � 140.00 � 420.00 � 750.00 � 450.00 � <br /> Manhole to be Adjusted <Concrete> � EACH � 3 �� 750.00 � 450.00 � 160.00 � 480.00 � 185.00 � 555.00 � <br /> Mixture for Cracks, Joints, and � � �� � � � � � � <br /> Flangeways � TONS � 10 �� 100.00 � 1,000.00 � 125.00 � 1,250.00 � 150.00 � 1,500.00 � <br /> � � �� � � ( � ( � <br /> � � �� � � � � � � <br /> ___________________________________�_________�_________��______________________�__________=___________�______________________� <br /> TOTAL B1D (AS CORRECTED) � � �� 882,780.00 � 922,120.00 � 939,790.00 � <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> Percent Over or (Under) ENGINEER'S ESTIMATE 4.46 6.39 • <br /> ♦ <br /> . <br /> f <br />