Laserfiche WebLink
� r <br /> � � t <br /> Project.........•••................ 8809 �) � � � <br /> Landmark Mall ��ENGINEER'S ESTIMATE �GLENDON INDUSTRIES �SINCLAIR ELECTRIC � <br /> Rehab Phase II �� �352 STH ST �PO BOX 38 � <br /> Retrofitting �� �MOLINE, IL 61265 �413 N DOUGLAS � <br /> Lighting Standards �� � �PETERSBURG, IL 62675 � <br /> �� � � � <br /> Bid Date........................... April 1, 1991 �� • � � � <br /> �� � � � <br /> Time............................... 10:00 am �� � � � <br /> �) � � � <br /> PAY ITEM � UNIT ( QTY �� UNIT � TOTAL � UNIT � TOTAL � UNIT � TOTAL � <br /> I I �� PRICE � � PRICE � � PRICE � � <br /> RETROFITTED LIGHTING STANDARDS � EA � 60 �� 800.00 � 48,000.00 � 795.00 � 47,700.00 � 1160.00 � 69,600.00 � <br /> FITTED TRAFFIC SIGNAL POST - 10' � EA � 5 �� 1000.00 � 5,000.00 � 450.00 � 2,250.00 � 530.00 � 2,650.00 � <br /> FITTED TRAFFIC SIGNAL POST - 8' � EA � 1 �) 1000.00 � 1,000.00 � 425.00 � 425.00 � 497.00 � 497.00 � <br /> fITTED STEEL MAST ARM ASSEMBLY & � I II I I I I I I <br /> POLE, 21" � EA � 2 �� 2000.00 � 4,000.00 � 1800.00 � 3,600.00 � 2478.00 � 4,956.00 � <br /> RETROFITTED DBL L[GHTING STANDARDS � EA � 7 �� 1200.00 � 8,400.00 � 1300.00 � 9,100.00 � 1756.00 � 12,292.00 � <br /> LIGHTED DIRECTORY I EA � 2 �� 1200.00 � 2,400.00 � 2450.00 � 4,900.00 � 474.00 � 828.00 � <br /> MISCELLANEOUS SIGN POSTS � EA � 5 �� 500.00 � 2,500.00 � 450.00 � 2,250.00 � 474.00 � 2,070.00 � <br /> � � �� � � � � � � <br /> ( � �� � � � � � � <br /> � � �� � � � � � � <br /> ( � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> ( � �� � � � � � � <br /> � ( �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> ___________________________________�_________�_________��______________________�______________________�______________________� <br /> TOTAL B1D (AS CORRECTED) � � �� 71,300.00 � 70,225.00 � 92,893.00 � <br /> ---------------------------------------------- <br /> Percent Over or (Under) ENGINEER�S ESTIMATE (1.51) 30.28 <br />