Laserfiche WebLink
� !+n�rt,cipality � Decatur illinois Department Section gg_08922-00-SP <br /> Towrar,�p' � of Transportation Fund Type <br />, . . � Decatur Federal Safety <br /> Counry, LOCAL AGENCY AGREEMENT State Contract Day Labor Local Contract RR Force <br /> � MdC011=.s " - FOR FEDERAL PARTICIPATION • _ .. Account X <br /> This agreement is made and entered into between the above local agency(LA)and the State of Illinois,acting by and through its Department <br /> of Transportation, hereinafter referred to as "STATE". The STATE and LA jointly propose to improve the designafed location as shown <br /> below.The improvement shall be constructed in accordance with plans approved by the STATE and the STATE's policies and procedures ap- <br /> proved and/or required by the United States Federal Highway Administration hereinafter referred to as FHWA. <br /> LOCATION <br /> Name Route 27th Street Length Miles <br /> Termini Crossing N0. 328 5250, M.P. 42.60 <br /> PROJECT DESCRIPTION Existing Str. No. <br /> Predicators added to existing signals and new rubber crossing. <br /> DIVISION OF COST <br /> TYPE OF WORK FHWA % STATE °o LA °io TOTAL <br /> Participating Construction ... . . . .. $ ( )$ 1 )$ ( 1$ <br /> Non-Participating Construction .... $ ( )$ ( )$ ( ►$ <br /> Preliminary Engineering . . ... . . .. . . $ ( )$ ( 1$ ( )$ <br /> Construction Engineering .. . ... ...$ ( )$ ( )$ ( )$ <br /> Rght of Way . . ... .... . .. . .. .... $ ( 1$ ( )$ 1 1$ <br /> Railroads ..... .... . ... . .... ..... $ 69,300 ( 90 ►g ( )$ 7,700 ( 10 1$ 77,000 <br /> Utilities . . . . .. . . .. .. .. .. .. .... ..$ ( )$ ( 1$ 1 )$ <br /> Sub Tota� � 69,300 $ $ 7,700 $ 7 7,000 <br /> Other funding Not Included Above . .. ... . ... . .. .... . . .. . . .. .. $ <br /> Source of Other Funding: <br /> Total Project Cost . ... .. . . . .. . . . ... ...... . . .. . ... . . ... ... . .. . . ... . . .. . . ... . .. . . . . . ... . . .. . ............. . . $ ��,��� <br /> NOTE: The above costs and percentages are approximate and subject to change. The percentage(s1 recorded and maintained by the <br /> STATE,will be used in the final division of costs for billings or reimbursements. <br /> If funding is lump sum and not a percentage of the total, place an asterisk in the space provided for the percentages.The Federal <br /> share ot construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> LOCAL AGENCY APPROPRIATION <br /> The LA on March 5 �9 91 a ro riated b t I ' n h h r f th st nd <br /> , pp p , y separa e reso utio $�,000.00 to pay t e LA's s a e o e co a <br /> will appropriate additional funds,if required to cover the LA's total cost. <br /> METHOD OF FINANCING (STATE CONTRACT WORK ONLY) <br /> METHOD A ---Lump Sum (95`%� of LA Obligation)$ <br /> METHOD B --- Monthly Payments of $ <br /> METHOD C ---LA's share $ divided by estimated totat cost multiplied by actua! progress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> ADDENDA <br /> Additional information and/or stipulations,if any,are hereby attached and identified below as being a part of this agreement. <br /> Addendum #1 Debarrment Certification; #2 Lobbving Certification <br /> (Insert NA, if not applicable) (lnsert addendum numbers or letters and page numbers, if applicable) <br /> The LA further agrees,as a condition of payment,that it accepts and will comply with the applicable provisions set forth on page two and all <br /> addenda indicated above. <br /> APPROVED APPROVED <br /> STATE OF ILLINOIS <br /> Name Gary K. Anderson EPARTMENT OFTR SPORTATION <br /> Title r By: �• <br /> air n C o /M ;Vitlage PresKlenL etc Director of ighways <br /> Signature �"`O ��"/ <br /> Date <br /> FOR DEPARTMENT USE ONLY <br /> Construction Engineering Right-of-Way <br /> ob Number Pro�ect Number Job Number Pro�ect Number Job Number Pro'ect Number <br /> C-95-003-90 RRS-D5 30) <br /> BLR 4251 (4-87) IL 494-0327 <br />