My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-94 ACCEPTING BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH BURDICK PLUMBING & HEATING COMPANY, INC. (CITY PROJECT 2016-10)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-94 ACCEPTING BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH BURDICK PLUMBING & HEATING COMPANY, INC. (CITY PROJECT 2016-10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2016 2:58:09 PM
Creation date
8/2/2016 2:57:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-94
Res Ord Title
ACCEPTING BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH BURDICK PLUMBING & HEATING COMPANY, INC. TO PERFORM 2016 ANNUAL WATER MAIN REPLACEMENT PROJECT, LAKE RIDGE ADDITION - CITY PROJECT 2016-10
Approved Date
7/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> 1 <br /> PAVEMENT REMOVAL SQ. YDS 40 <br /> ' CLASS D PATCHES, 5-INCH SQ. YDS 40 <br /> ' TRENCH BACKFILL TONS 250 <br /> TRAFFIC CONTROL LUMP SUM 1 <br /> ' MOBILIZATION LUMP SUM 1 <br /> ' AD-1-4 SPECIAL PROVISIONS <br /> ' 4.01 The following Special Provisions have been added to the Project Manual: <br /> ' SP-13 <br /> Description: This work will consist of excavating in West Rock Spnngs Road on <br /> ' both sides of the Norfolk Southern Railroad. Cut the 12-inch cast iron water main on the <br /> East side of the Railroad. Remove a 5 foot piece of the existing water main. On the west <br /> side locate the existing 12-inch valve, install the friction clamp and restrain the 12-inch <br /> ' valve. Remove a 5-foot section of the existing cast iron water main. Insert a steel cable <br /> into the existing water main to facilitate removal of the 12-inch water main from inside of <br /> the casing. Remove the water main from the casing. Install the new 12-inch D.I.P. water <br /> ' main into the casing using the required spacers. Swab the inside of the 12-inch water <br /> main with chlorine as it is installed. Sleeve the new water main to the existing water <br /> main on the east side using a MJ sleeve and grip rings. Tap the new 12-inch water main <br /> ' on west side using a 1-inch corporation for chlorine and pressure testing. On the west side <br /> finish installing the 12-inch D.I.P. and make connection to the existing water main using <br /> a MJ sleeve and grip rings. Pressure test and sample the water main for chlorine residual. <br /> ' Install the end seals on the casing. Back fill both excavations in 1-foot lifts and compact <br /> each lift. <br /> Basis of Payment: Provide all labor and materials necessary to remove old water <br /> ' main, install the new water main and appurtenances according to the plans and <br /> specifications and bid. <br /> ' Please make proper acknowledgment of addenda#1 on page 15 of your bidding <br /> documents. <br /> ' <br /> ' END OF ADDENDUM NO. 1 <br /> Engineering Services Coordinator: � . � ,� Date: 1 '7.�[/fi� I(v <br /> ' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.