My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-95 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH SAK CONSTRUCTION, LLC (CITY PROJECT 2016-28)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-95 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH SAK CONSTRUCTION, LLC (CITY PROJECT 2016-28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 11:32:06 AM
Creation date
8/3/2016 11:30:25 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-95
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH SAK CONSTRUCTION, LLC, FOR 2016 TRENCHLESS LONG LINING REPAIRS PROJECT CITY PROJECT 2016-28
Approved Date
8/1/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> The above named documents are essential parts of the Contract, and a requirement <br /> occurring in one is as binding as though occurring in all. They are intended to be <br /> complementary and to describe and provide for a complete work product. <br /> In case of discrepancy,the order of precedence is as follows: <br /> 1. Contract Change Orders <br /> 2. Addenda <br /> 3. Contract <br /> 4. Special Provisions& Drawings <br /> 5. Special Conditions <br /> 6. Supplemental Specifications <br /> 7. General Conditions <br /> In the event there is a conflict between any of the above listed documents, the <br /> provision of the document with the lower numerical value shall govern over those <br /> documents with a high numerical value. <br /> The Contractor shall not take advantage of any apparent enor or omission in the <br /> plans or specifications. In the event the Contractor discovers such an error or <br /> omission, the bidder shall immediately notify the Owner. The Owner will then make <br /> such corrections and interpretations as may be deemed necessary for fulfilling the <br /> intent of the plans and specifications. <br /> 6. It is agreed by the parties to this Contract that this Contract shall be executed in <br /> quadruplicate, one copy for the Contractor, and three copies for the Owner. <br /> ATTEST: CITY OF DECATUR, ILLINOIS <br /> By <br /> CITY CLERK MAYOR <br /> I <br /> SAK CONSTRUCTION, LLC <br /> By <br /> SECRETARY (Corporate Seal) PRESIDENT <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.