My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R90-76 AUTHORIZING AGREEMENT WATER MAIN INSTALLATION AT MACON COUNTY FAIRGROUNDS
COD
>
City Clerk
>
RESOLUTIONS
>
1990
>
R90-76 AUTHORIZING AGREEMENT WATER MAIN INSTALLATION AT MACON COUNTY FAIRGROUNDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 11:25:49 AM
Creation date
8/4/2016 11:25:49 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R90-76
Res Ord Title
AUTHORIZING AGREEMENT WATER MAIN INSTALLATION AT MACON COUNTY FIARGROUNDS - MACON COUNTY FARM BUREAU
Approved Date
6/18/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City, the Farm Bureau and the Fair Association. <br /> 3 . The Farm Bureau and the Fair Association are responsible <br /> for informing the City of the location of all existing <br /> underground utilities, and the Farm Bureau and the Fair <br /> Association shall be liable for all costs incurred by the City in <br /> the installation of the six-inch water main caused by the lack <br /> of, or inaccurate, information regarding said existing utilities. <br /> 4 . The Farm Bureau and the Fair Association shall reimburse <br /> the City for the cost of installation of the six-inch water main <br /> herein described. Payment shall be made in the manner <br /> established by the provisions of Chapter 65 of the Cizy Code for <br /> connection charges. Said cost of installation sha11 be <br /> determined according to the following formula: <br /> Cost of 6" water main I <br /> Cost of lineal feet of water main per lineal foot on � <br /> Tnstallation = installed at Premises x C.P. 9001 , as shown <br /> on the contract for <br /> said Project, <br /> PLUS costs incurred by City pursuant to paragraph 3 hereof. <br /> 5 . No construction or installation under the terms of tl:is <br /> Agreement shall take place between July 24 ar_d Jul�� ?_g , ?99Q . <br /> 6 . Upon installation, and acceptance thereof, in writing, <br /> by Farm Bureau, Farm Bureau will be sol�ly responsi�le for the <br /> maintenance of said six-inch water main, and the Citv shall have <br /> no liability nor responsibility therefor, and the same ahall �e <br /> the property of Farm Bureau. <br /> 7 . The cost of installation, as determined bv paragraph 4 <br /> hEreof, shall be a lien on the Premises, and the City shall have <br />
The URL can be used to link to this page
Your browser does not support the video tag.