Laserfiche WebLink
. <br /> Project............................ 9008 �� � � � <br /> Milling and ��ENGINEER�S ESTIMATE �DUNN C0. �ILLINOIS VALLEY PAVING� <br /> Rehabilitation �� �724 N. MERCER �P.O. BOX 648 � <br /> �� �DECATUR, [L 62522-1699�DECATUR, ll 62525 � <br /> Bid Date........................... April 18, 7990 �� � � � <br /> �� � � � <br /> Time............................... 10:30 am �� � � � <br /> �� � � � <br /> �� � � � <br /> PAY ITEM � UNIT � �TY �� UNIT � TOTAL � UNIT � TOTAL � UNIT � TOTAL � <br /> � � �� PRICE � � PRICE � � PRICE � � <br /> COLD MILLING � SY � 76,300 �� 1.25 � 95,375.00 ( 1.20 � 91,560.00 � 1.30 � 99,190.00 � <br /> VALVE BOXES TO BE REPLACED � EA � 3 �� 300.00 � 900.00 � 300.00 � 900.00 � 225.00 � 675.00 � <br /> MANHOLE FRAME 8 LID, TY 1, CL � EA � 3 �� 500.00 � 1,500.00 � 500.00 � 1,500.00 � 275.00 � 825.00 � <br /> BITUMINOUS MATERIALS (PRIME COAT) � GAL � 19,000 �� 1.00 � 19,000.00 � 1.00 � 19,000.00 � 0.90 � 17,100.00 � <br /> AGGREGATE (PRIME COAT) � TON � 790 �� 10.00 � 1,900.00 � 11.00 � 2,090.00 � 12.50 � 2,375.00 � <br /> BIT CONC SURF CSE CL I � TON � 7,050 (� 31.00 � 218,550.00 � 33.75 � 237,937.50 � 34.25 � 241,462.50 � <br /> AREA REFLECTIVE CRACK CONTROL � SY � 76,300 �� 0.70 � 53,410.00 � 0.70 � 53,410.00 � 0.79 � 60,277.00 � <br /> MIXTURE FOR CRACKS/JOINTS/FLANGEWAY� TON � 10 (� 100.00 � 1,000.00 � 100.00 � 1,000.00 � 150.00 � 1,500.00 � <br /> VALVE BOX MILLING � EA � 55 �� 110.00 � 6,050.00 � 110.00 � 6,050.00 � 125.00 � 6,875.00 � <br /> MANHOLE MILLING � EA � 80 �� 125.00 � 10,000.00 � 725.00 � 10,000.00 � 150.00 � 12,000.00 � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � (� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � � � � � � I <br /> ___________________________________�_________�_________��______________________�______________________�______________________� <br /> TOTAL B1D (AS CORRECTED) � � �� 407,685.00 � 423,447.50 � 442,279.50 � <br /> ---------------------------------------------------- <br /> Percent Over or (Under) ENGINEER'S ESTIMATE 3.87 8.49 <br />