Laserfiche WebLink
Project..•••.....••••••............ 9007 �� ( � � <br /> Street Resurfacing ��ENGINEER'S ESTIMATE �DUNN C0. �ILLINOIS VALLEY PAVING� <br /> Conventional �� �724 N. MERCER �P.O. BOX 648 � <br /> �� �DECATUR, Il 62522-1699�DECATUR, IL 62525 � <br /> Bid Date........................... April 18, 1990 �� � � � <br /> �� � � � <br /> Time............................... 10:30 am �� � � � <br /> �� � � � <br /> �� � � � <br /> �� � � � <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> PAY ITEM � UNIT � QTY �� UNIT � TOTAL � UNIT � TOTAL � UN1T � TOTAL � <br /> I I II PRICE � � PR10E � � PRICE � � <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> AREA REfLECTIVE CRACK CONTROL ( SY ( 50,000 �� 0.75 � 37,500.00 � 0.70 � 35,000.00 � 0.79 � 39,500.00 � <br /> BIT CONC SURF CSE CL I � TON � 16,650 �� 31.00 � 516,150.00 � 33.50 � 557,775.00 � 34.25 � 570,262.50 � <br /> LEVELING BINDER (MACHINE METNOD) � TON � 3,000 �� 31.00 � 93,000.00 � 33.50 � 100,500.00 � 34.25 � 102,750.00 � <br /> BIT MATL RC70 (PRIME COAT) � GAL � 12,000 �� 0.80 � 9,600.00 � 0.60 � 7,200.00 � 0.90 � 10,800.00 � <br /> BIT MATL AC85-100 (PRIME COAT) � GAL � 10,000 �� 1.00 � 70,000.00 � 1.00 � 10,000.00 � 0.90 � 9,000.00 � <br /> PRIME COAT AGGREGATE � TON � 300 �� 10.00 � 3,000.00 � 10.00 � 3,000.00 � 12.50 � 3,750.00 � <br /> PAVEMENT REMOVAL, SURFACE COURSE � SY � 2,500 �) 6.25 � 15,625.00 ( 6.40 � 16,000.00 � 7.00 � 17,500.00 � <br /> VALVE BOX � EA � 3 �� 130.00 � 390.00 � 130.00 � 390.00 � 150.00 � 450.00 � <br /> MANHOLE FRAME & L1D, TY 1 � EA � 3 �� 175.00 � 525.00 � 175.00 � 525.00 � 190.00 � 570.00 � <br /> VALVE BOX TO BE ADJUSTED (ASPHALT) � EA � 145 �� 75.00 ( 10,875.00 � 75.00 � 10,875.00 � 85.00 � 12,325.00 ( <br /> VALVE BOX TO BE ADJUSTED (CONCRETE)� EA � 3 �� 150.00 ( 450.00 � 150.00 � 450.00 � 175.00 � 525.00 ( <br /> MANHOLE TO BE ADJUSTED (ASPHALT) � EA � 3 �� 130.00 � 390.00 � 130.00 � 390.00 � 150.00 � 450.00 � <br /> MANHOLE TO BE ADJUSTED (CONCRETE) � EA � 3 �� 150.00 � 450.00 � 150.00 � 450.00 � 185.00 � 555.00 � <br /> MIXTURE FOR CRACKS/JOINTS/FLANGEUAY� TON � 10 �� 100.00 � 1,000.00 � 100.00 � 1,000.00 � 150.00 � 1,500.00 � <br /> � � �� � � � � � � <br /> � � �� � � � � � � <br />' � � �� � � � � � � <br /> � � �� � � � � � � <br /> � � �� � ( � � � ( <br /> � � �� ( � � � � � <br /> ( � �� � � � � � � <br /> ( � �� � � � � � � <br /> � � �� � � � � � � <br /> ___________________________________�_________�_________��______________________�______________________�______________________� <br /> TOTAL BID (AS CORRECTED) � � �� 698,955.00 � 743,555.00 � 769,937.50 � <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> Percent Over or (Under) ENGINEER�S ESTIMATE 6.38 10.16 <br />