My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R90-18 AUTHORIZING ENGINEERING AGREEMENT (CITY PROJECT 8919)
COD
>
City Clerk
>
RESOLUTIONS
>
1990
>
R90-18 AUTHORIZING ENGINEERING AGREEMENT (CITY PROJECT 8919)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:19:17 AM
Creation date
8/5/2016 9:19:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R90-18
Res Ord Title
AUTHORIZING ENGINEERING AGREEMENT FARIES PARK BASIN DREDGING CITY PROJECT 8919
Approved Date
2/19/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, - . <br /> . ' <br /> PHASE 3 <br /> A. Retention Site Construction $ 32,700.00 <br /> B. Dredging Work $ 80,000.00 : <br /> C. Reclamation Planning & Preliminary Design $ 10.300.00 <br /> SUBTOTAL $123,000.00 <br /> D. Reimbursables <br /> 1. Construction Material Testing $ 8,000.00 � <br /> 2. BWC - Retention - Mileage (3,200 x 0.25) $ 800.00 <br /> 3. BWC - Retention - Reports, Photos $ 200.00 <br /> 4. BWC - Dredging - Mileage (4,500 x 0.25) $ 1,125.00 <br /> 5. BWC - Dredging - Reports, Photos $ 875.00 <br /> 6. CWI - Mileage (4,000 x 0.25) $ 1,000.00 , <br /> 7. BWC - As Builts - Vehicle (12 x $40/day) _ $ 480 <br /> - EDM (12 x $100/day) _ $1,200 <br /> - Misc. _ $ 120 $ 1,800.00 <br /> 8. Effluent Sample Testing <br /> Assume two discharge locations for 65 weeks: <br /> 130 weeks x $170/week $ 22.100.00 <br /> $ 35,900.00 <br /> PHASE 3 TOTAL $158,900.00 <br /> � <br /> B - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.