APPENDIX A <br /> Preliminary Project Execution Schedule <br /> Dredging Faries Park Basin <br /> Lake Decatur. Decatur, IL <br /> City Project 8919 <br /> 1/24/90 <br /> ACTIVITY PROBABLE TIME FRAME <br /> PHASE <br /> 1. Select Engineer/Negotiate Contract Jan., 90 - Feb., 90 <br /> 2. Retention Site Identification Feb., 90 - March, 90 <br /> 3. Alternative Analysis & Location Selection March, 90 - May, 90 � <br /> 4. Dredging Methods Feb., 90 - April, 90 <br /> 5. Aerial Photography and Topography Feb., 90 - June 90 <br /> 6. Sediment Survey April, 90 , - July, 90 <br /> 7. Soils Boring & Geotechnical Report June, 90 - Aug., 90 <br /> 8. Water Quality & Sediment Testing . April, 90 - June, 90 <br /> 9. Environmental Report Development May, 90 - Aug., 90 <br /> 10. [OptionalJ Pollution Control Variance Aug., 90 - Dec. 90 <br /> Submittal & Resolution <br /> 11. Permit Application & Processing Aug., 90 - Dec.� 90 <br /> 12. Retention Site Reclamation and <br /> Alternate Sediment Usage Feb., 90 - May, 90 <br /> PHAS II (Dependent Upon Site Acquisition & Permit Resolution) � <br /> 1. Retention Site Contract Document Preparation AUG., 90 - FEB.� 91 <br /> 2. Project Bid Phase March, 91 - April, 91 <br /> 3. Receive Bids &Award Construction Contract April, 91 - May, 91 <br /> 4. Retention Site Construction (Phase III) May. 91 - Dec., 91 <br /> 5. Hydraulic Dredging Contract Document <br /> Preparation Dec., 90- May, 91 <br /> 6. Project Bid Phase May, 91 - June, 91 <br /> 7. Receive Bids &Award Construction Contract June, 91 - July, 91 <br /> 8. Hydraulic Dredging Work Mobilization Aug, 91 - Sept., 91 <br /> 9. Hydraulic Dredging Work (Start Date Depends <br /> Upon Completion of #4 Above) Dec., 91 - Dec., 93 � <br /> PHAS III <br /> 1. Resident Inspection, Testing, Monitoring and <br /> Survey Documentation as per Items #4 and #9 <br /> Above. <br /> 2. Retention Site Reclamation Planning & Design Feb., 94 - July, 94 <br /> A - 1 <br />