R90-04 ACCEPTING THE BID AND AUTHORIZING A CONTRACT (CITY PROJECT 8923)
COD
>
City Clerk
>
RESOLUTIONS
>
1990
>
R90-04 ACCEPTING THE BID AND AUTHORIZING A CONTRACT (CITY PROJECT 8923)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:53:58 AM
Creation date
8/5/2016 9:53:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R90-04
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT CITY PROJECT 8923 REMODELING FOR DMCOC - CHIC FACILITY
Approved Date
1/16/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � r . ' . <br /> ARTICLE 5 <br /> � �` PROGRESS PAYMENTS <br /> 5.1 E3ased upon Applications for Payment submitted to the Architect by the Contractor and Cerdficates for Payment issued by thc <br /> Architect, the Owner shail make progress payments on account of the Contract Sum to the Contractor as provided below and <br /> elsewhere in the Contract Documents. <br /> 5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month,s�a� <br /> �fc�lbe��s: <br /> 5.3 Provided an A�plication for Payment is received by the Architcct not later th:in the f i f teenth <br /> day of a month,the Owner shall make payment to the Contractc�r not later than <br /> the f i f teenth day of the fo l lowing month. If an Application for Payment is received by thc <br /> Architect after the arplication date fixed above, payment shall be made b}�the Owner not later than thirty <br /> 30 days afrer the Architect receives the Application for Payment. <br /> 5.4 Each AppHcation for Payment shall be based upon the Schedule of Values submitted by the Contractor in acccxdance aith <br /> the Contract Documents. The Schedule of Values shall ailocate the entire Contract Sum among the various pc�rticros of the Wexk <br /> •, and be pre�ared in such form and supported by such data to substantiate its accuracy as the Architect may reyuire.This Schedule, <br /> unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. <br /> 5.5 Applicatic�ns for Payment shall indicate the percentage of completion of each pvrtion of the Work as of the end of the peric�d <br /> co�•ered by the Aprlication for Payment. <br /> � 5.6 Subject to the provisions of the Contract Documents, the amount of each progress�ayment shall be computed as follc�a•s: <br /> 5.6.1 Take that pc�rticm of the Contract Sum rroperly allc�cahle to completed Work as determined by muitiplying the percentaRe <br /> completion of each portion of thc Work by the share of the total Contract Sum allocated to that portion of the Work in the <br /> Schedule of Values, less retainaRe of ten ' �ercent <br /> ( 10 "/,). Pending flnal determination of cost ro the Owner c�f changes in the Work,amounts not in disrute may he <br /> included a5 provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet heen adjusted by <br /> Change Ordcr; <br /> 5.6.2 Add that �orticm of the Cc�ntract Sum �ro��erly allocable to materiak anel equirment delivered and suitahly stc>red at the <br /> site fcir suhseyuent incor�oration in the complcted ce�nstrucdon(or,if a�proved in advancc hy the Owner,suitably stored<>ff the <br /> site at a location agrced upon in writing),less retainage of t en <br /> rcrccnt ( 10 %,); <br /> 5.6.3 Suhtract the a�rcgate of Previvus hayments made by the Owncr, and <br /> 5.6.4 Subtract amounts, if an}�, fur which the Architect has withheld or nullified a Certificate fc>r Payment as provided in Para- <br /> gra�h 9.5 �f the General Conditions. <br /> 5.7 7'he proRress payment amount determined in accordance with Paragraph 5.6 shall be fiirther modified under the Follo�vinR <br /> circumstances: <br /> 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient ro increase the t<�tal payments to <br /> nine ty-f ive percent( 95 %)of the Contract <br /> Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and <br /> 5.7.2 Add, if final com��letion of the ��G'c�rk is thereafter materially delayed through no faalt of the Contractor, any additic�n.d <br />' amounts pa}�able in acce�rdance a�ith Subparagraph 9.t0.3 of the General Conditions. <br /> 5.8 Reducticm or limitation of retaina�e, if any, shall be as follows: <br /> (/J r!is irNrnArd,prror lu Subslrnrfirrl Cnmpk•fiurt oj tbe errlir��W i�rk. 7u rerh�i'��or frnril 7he rclninag��resedNnk frunr�h��perci�iungrs rnsrrr�•rl rn.t'nB/�nrn- <br /> ,n,ra/rlrs 5 6.1 and 5.6.2 nNure.rrnd lCris is ruN e.�/�lr�irter/��Iser�•berr frr!be Giinlrrtcf I)nrtont��tls. ireser'!bprp/�ru�•isiuns/nr su<'h n�e/in liun or lintilafirn�) <br /> ` <br /> AIA DOCUMENT A101 • OV�'NF.R-CON7'RACTOR AGRF.F:MF.N7' • 7'VI'EI.FTH EUI'll<)N • AIA" • CJ19N' <br /> l'IIF.AMERICAN INSTITI�TF.OF ARCIIITF.CTS,17i5 NF.W YORK AVF.NUE,N.W.,V�'ASHINGI'(/N,1).C.21NNKi A101-198T 4 <br />