My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R89-113 AUTHORIZING AGREEMENT - WVP CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
1989
>
R89-113 AUTHORIZING AGREEMENT - WVP CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 2:45:43 PM
Creation date
8/8/2016 2:45:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R89-113
Res Ord Title
AUTHORIZING AGREEMENT - WVP CORPORATION
Approved Date
8/21/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. With the assistance of the ENGINEER obtain approval of all governmental <br /> authorities having jurisdiction over the project and such approvals and consents <br /> from such other individuals or bodies as may be necessary for completion of the <br /> project. <br /> J. The OWNER will require that any Contractor or subcontractors performing work <br /> in connection with drawings and specifications produced under this Agreement to <br /> hold harmless, indemnify and defend,the OWNER and the ENGINEER,their <br /> consultants, and each of their officers, agents and employees from any and all <br /> liability claims, losses or damage arising out of or alleged to arise from the <br /> contractor's,or subcontractor's, negligence in the performance of the work <br /> described in the Construction Contract Documents, but not including liability that <br /> may be due to the sole negligence of the OWNER,the ENGINEER,their <br /> consultants or their officers, agents and employees. <br /> K. Builders Risk "All Risk" Insurance-Before commencement of the work,the <br /> OWNER will require that the Contractor and any Subcontractors submit written <br /> evidence that he (they) have obtained for the period of the Construction <br /> Contract, Builders Risk "All Risk" Completed Value Insurance Coverage, including <br /> earthquake and flood, upon the entire Project which is the subject of the <br /> Construction Contract. Such insurance shall include as additional named insured; <br /> the OWNER;the ENGINEER; and each of their officers, agents,employees and <br /> any other persons with an insurable interest as may be designated by the <br /> OWNER. Such insurance may have a deductible clause but not to exceed $5,000, <br /> except that the earthquake deductible may be in accordance with generally <br /> accepted insurance practices in the locale where the coverage is issued. <br /> ESTIMATES Paragraph 8-Estimates. <br /> Any Opinion of the Probable Construction Cost prepared by the ENGINEER represents <br /> his judgement as a design professional and is supplied for the general guidance of the <br /> OWNER. Since the ENGINEER has no control over the cost of labor and materials or <br /> over competitive bidding and market conditions,the opinions of probable construction <br /> cost provided for herein are to be made be on the basis of his experience and <br /> qualifications, but the ENGINEER does not guarantee the accuracy of such opinions as <br /> compared to the Contractor's bids or the project construction cost. <br /> INSURANCE Paraaraph 9- Insurance. <br /> The ENGINEER shall maintain such insurance as will protect him from claims under <br /> the Workmen's Compensation Acts and from claims for bodily injury, death or <br /> property damage which may arise from the performance of his work. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.