Laserfiche WebLink
GOVERNING Paragraph 14-Governing Law. <br /> LAW <br /> Unless otherwise specified within this Agreement,this Agreement shall be governed by <br /> the law of the State of Illinois. <br /> GENERAL Paragraph 15-General. <br /> Neither party shall hold the other responsible for damages or delay in performance <br /> caused by acts of God,strikes, lockouts, accidents or other events beyond the control <br /> of the other or the other's employees and agents. <br /> In the event any provisions of this Agreement shall be held to be invalid and <br /> unenforceable,the remaining provisions shall be valid and binding upon the parties. <br /> One or more waivers by either party of any provision,term, condition or covenant <br /> shall not be construed by the other party as a waiver of a subsequent breach of the <br /> same by the other party. <br /> The ENGINEER has not been retained or compensated to provide design and <br /> construction review services relating to the Contractor's safety precautions or to <br /> means, methods,techniques,sequences or procedures required for the Contractor to <br /> perform his work, but not relating to the final or completed structure; omitted <br /> services include, but are not limited to,shoring,scaffolding, underpinning,temporary <br /> retainment of excavations and any erection methods and temporary bracing. <br /> The ENGINEER intends to render his services under this Agreement in accordance <br /> with generally accepted professional practices for the intended use of the project and <br /> makes no warranty either express or implied. <br /> VERIFICATION Paraoraph 16-Verification of Existina Conditions <br /> Inasmuch as the rehabilitation of an existing structure requires that certain <br /> assumptions be made regarding existing conditions, and because some of these <br /> assumptions may not be verifiable without expending additional sums of money, or <br /> destroying otherwise adequate or serviceable portions of the structure,the OWNER <br /> agrees that, except for negligence on the part of the ENGINEER,the OWNER will <br /> hold harmless, indemnify and defend the ENGINEER from and against any and all <br /> claims arising out of the professional services under this agreement. However,this <br /> Paragraph shall apply only to rehabilitation projects and assumptions made because of <br /> additional sums of money required to determine actual existing conditions. <br /> HAZARDOUS Paraaraph 17-Hazardous Materials <br /> MATERIAL <br /> The OWNER and ENGINEER have no knowledge of any hazardous materials, including <br /> asbestos, on or about the project site. The handling, sampling,testing, identifying, <br /> removal or designing for removal of such materials is not part of this contract. <br /> Should such material be encountered and identified during ENGINEER'S work or during <br /> construction,the ENGINEER shall stop work, give notice to the OWNER and shall <br /> resume work only upon the mutual agreement of both the OWNER and the ENGINEER. <br /> 7 <br />