Laserfiche WebLink
_ ,. <br /> 1� � � - � i � <br /> TANK INDUS RY O SULTANTS, INC. <br /> 4912 West 16th Street P.O. Box 24359 Telephone: 317 / 244-3221 <br /> Speedway,Indiana 46224 <br /> July 26, 1989 <br /> Mr. James R. Mayhugh <br /> Assistant Director <br /> City of Decatur <br /> 1 Civic Center Plaza <br /> Decatur, Illinois 62523 <br /> RE: Professional Services - Prenaration of Detailed Technical <br /> Specifications and Contract Documents for a 1, 000,000 Gallon Ele- <br /> vated Water Tank and a 1, 500, 000 Gallon Elevated Water Tank in <br /> Decatur, Illinois. <br /> TIC Reference 89-121-04 <br /> TIC Job # 89-IL-905. 01 &. 02 <br /> Dear Mr. Mayhugh: <br /> In confirmation of our telephone conversation on July 19, 1989, I <br /> am pleased to provide you with the following information. <br /> TANK INDUSTRY CONSULTANTS, INC. , is a consulting engineering firm <br /> specializing in inspection, specification and design of steel <br /> water storage tanks. Because we are an unbiased third party, our <br /> inspections are performed without the desire to obtain contracts <br /> for painting, repairs, or materials. <br /> PREPARATION OF DETAILED TECHNICAL SPECIFICATIONS <br /> Based on our prebid inspection reports, you can determine what <br /> repairs are to be performed. After you inform us of the scope <br /> you wish the project to cover, we can begin to prepare Detailed <br /> Technical Specificatic:�s an V:hich the contractor� can bid. If <br /> desired we can also assemble the contract documents, review bids, <br /> give recommendations for awarding the contract, and administer <br /> the contract. If TANK INDUSTRY CONSULTANTS, INC. were to prepare <br /> the Detailed Technical Specifications for the 1, 000,000 Gallon <br /> and 1,500,000 Gallon tanks, contract documents incorporating the <br /> � two tank repairs into one rehabilitation project, and administer <br /> the contract, the cost would be $8, 000.00. The proposed cost is <br /> contingent upon TANK INDUSTRY CONSULTANTS, INC. receiving proper <br /> authorization to initiate the preparation of the contract docu- <br /> ments prior to September 1, 1989. <br />