Laserfiche WebLink
i ,._ �__..,....�.w�.,.�_. .�_..-.......�.�..�....�___ _..__..� _.__...."_ ._ __ ...,� _ ._ �_ . , ,. <br /> � r i ' <br /> ` y CIVIL ENGINEERS <br /> • • GEOTECHNICAL ENGINEERS <br /> SIiAF ER•I(RIMME�•SI�VER STRUCTURALENGINEERS <br /> 3 A&SOCIATES, INC. CONSULTING EN(aiNEERS LAND SURVEYORS <br /> CONSTRUCTION�UALITY CONTROL <br /> 2900 N.Broadway • P.O.Box 2233 • Decatur,Iilinois 62526 • 217/877-2100 MATERIALS TESTING <br /> City Water Projects <br /> . Project � Lakes Tokorozawa Pumping <br /> To: <br /> Mr. Wm. B. Sands, Director Date December 15, 1988 <br /> Department of Public Works <br /> #1 Civic Center Plaza Project tvo. I8-83936-2678 <br /> Decatur, Illinois 62523 <br /> Invoice No. 83936-1 <br /> � CONFERENCES, CONSULTATION, SOIL DRILLING, LABORATORY <br /> TESTING, MONITOR WELL INSTALLATIONS/REPAIR/SAMPLING, <br /> I GROUNDWATER TESTING� VANE SHEAR TESTING, AND <br /> GEOTECHNICAL ENGINEERING <br /> SERVICES PERFORMED DURING SEPT. THRU NOV. , 1988 <br /> ENGINEERING SUPERVISION, ANALYSIS <br /> & PREPARATION OF REPORTS <br /> Registered Professional <br />� Engineer (Firm Principal) 60.0 Hours a $70.00/Hr. $ 4,200.00 <br /> � Registered Professional � <br /> Engineer 32.0 Hours @ $60.00/Hr. 1 ,920.00 <br /> Senior Technician 62.0 Hours @ $40.00/Hr. 2,480.00 <br /> Technician 25.0 Hours @ $30.00/Hr. 750.00 <br /> LABORATORY CLASSIFICATION, <br /> TESTING & EQUIPMENT USAGE <br /> Senior Technician 21 .75 Hours @ $37.50/Hr. 815.62 <br /> FIELD DRILLING & SAMPLING <br /> Furnishing Drill Rig, <br /> Truck & Equipment with <br /> Two-Man Crew 73.75 Hours @ $100.00/Hr. 7,375.00 <br /> GROUNDWATER MONITOR WELL INSTALLATION <br /> One 40.5 ' , 4" Dia PVC; and four <br /> 25.0' , 32.5' ; 39.5 ' and 61 ' , 2" Dia PVC <br /> GWMW; materials, drilling & development Lump Sum 3,916.16 <br /> TERMS: NET 30 OAY$AFTER DATE OF INVOICE A CMAROE OF 1�h%PER MONTH OF UNPAID BALANCE <br /> (ANNUAL PERCENTAOE RATE 18%)WILI BE APPLIED TO PAST DUE ACCOUNTS <br />