Laserfiche WebLink
• <br /> Chapter 69 <br /> only when new conductors are being installed. Such inspections <br /> will be of the electrical service only. <br /> During severe weather conditions the Superintendent of the <br /> Inspection Department may waive all permits and inspections. <br /> Under such conditions the repaired services must remain the same <br /> size and materials must be used accordingly. If a larger size <br /> service is requested by the owner, then all such provisions of <br /> this code shall apply. <br /> 12 . INSPECTIONS: All electrical wiring installed under a <br /> permit issued as herein provided must be inspected before being <br /> concealed and must have a final approved inspection before the <br /> Certificate of Occupancy is eligible for issuance. It is the <br /> responsibility of the electrical contractor, or those making <br /> electrical installations or" alterations, to give such timely <br /> notice requesting inspections. It may be necessary at various <br /> times to lengthen the time before inspections can be made and <br /> shall be at the discretion of the Building Inspection Supervisor. <br /> Failure to call for final electrical inspections before <br /> structures are occupied or after job completion, will be cause <br /> for the Inspection Department to submit the case before the <br /> Electrical Commission for possible license suspension or <br /> revocation. The Inspection Department may revoke a permit or <br /> withhold approval of work in case there has been a false <br /> statement or representation as to a material fact in the <br /> application, the plans, or specifications upon which such <br />