Laserfiche WebLink
Chapter 67 <br /> law" for the words "at all appropriate times" . <br /> (b) 105. 4 by inserting the words "or his or her authorized <br /> representative" after the words "code official" where it first <br /> appears in this subsection. <br /> (c) 107. 5 by inserting the words "as prescribed in the City <br /> of Decatur Process and Design Criteria" after the words <br /> "construction documents" . <br /> (d) 110. 3 by adding: All underground tanks on the site shall <br /> be removed and all wells, cisterns, septic tanks and similar <br /> structures broken open and, along with all excavations, filled to <br /> within six (6) inches of the proposed ground surface to eliminate <br /> voids. The top six (6) inches shall be filled with a compacted, <br /> clean top soil material, unless lot is to be paved. Foundation <br /> walls shall be removed to at least two (2) feet below the <br /> proposed ground surface. Subsurface floors to be left in place <br /> shall be broken up to allow drainage. Al1 excavations shall be <br /> filled to meet adjacent, undisturbed grade elevations. <br /> (e) 107 . 6 by deleting the last sentence. <br /> (f) 109 . 1 by deleting "as approved by the board of <br /> appeals" . <br /> (g) 109 . 3 by deleting "or as directed by the board of <br /> appeals" . <br /> (h) 111. 1 by substituting the words Section 9 of Chapter 67 <br /> of the City Code for the words "Section 112 . 0" . <br /> (i) 112 . 1 by substituting the phrase, "by ordinance shall <br />