93-81 AUTHORIZING CHANGE ORDERS - MARTIN LUTHER KING JR. DRIVE EXTENSION
COD
>
City Clerk
>
ORDINANCES
>
1993
>
93-81 AUTHORIZING CHANGE ORDERS - MARTIN LUTHER KING JR. DRIVE EXTENSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 4:33:44 PM
Creation date
8/12/2016 4:33:43 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
93-81
Res Ord Title
AUTHORIZING CHANGE ORDERS - MARTIN LUTHER KING JR. DRIVE EXTENSION
Approved Date
11/15/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ` <br /> �� • <br /> November 5, 1993 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 93 - 57 <br /> MEMORANDUM T0: Honorable Mayor and City Council <br /> FROM: James C. Bacon, Jr. , City Manager c <br /> William B. Sands, Director of Public Works �� <br /> SUBJECT: Extension of M. L. King, Jr. Dr. Northerly <br /> An item on the agenda for the meeting of November 15, 1993, <br /> is a resolution approving a Change Order to the present contract <br /> with Dunn Company and Phillip W. Cochran, Consulting Engineer, on <br /> the Ash Avenue to Mound Road portion of the subject project, to <br /> extend the facility approximately 1200 feet northerly to serve <br /> the recently annexed Phillips property, as was agreed by Council <br /> in the pre-annexation agreement dated April 20, 1992. <br /> Constructing the project by Change Order is recommended for <br /> the following reasons: <br /> 1. We are availing ourselves of the right to utilize the <br /> unit prices included in the existing contract, which we <br /> feel would be lower than those we would receive if the <br /> project were to be let for bids. <br /> 2. It will allow us to meet the December 31, 1993, <br /> deadline set forth in the agreement with Phillips. , <br /> 3. The Change Order method will not require the detailed <br /> plan and contract document preparation normally <br /> required for letting. (We would use the existing plan <br /> details and specifications) . <br /> 4. Due to the above, engineering costs would be <br /> substantially less, which are estimated to be $22,500 <br /> (actual payroll costs plus a fixed fee of $4,500) . The <br /> existing engineering contract is approximately 6.4�, <br /> with the proposed fee estimated at 5. 4�, based on the <br /> Change Order amount of $442, 813.50. <br /> The proposed extension will be a three-lane pavement from <br /> Shutter Lane to the future Boyd Avenue and two lanes northerly <br /> thereof, approximately 200 feet north of Boyd. The proposed <br /> extension is to be a concrete pavement, to match the existing <br /> concrete pavement behind Wal-Mart (Ash to Shutter) . A plat <br /> showing the improvement and other data is attached. <br /> Staff recommends the approval of the resolution and will be <br /> available to answer any questions you may have at the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.