Laserfiche WebLink
, Sec•tion 4"d" . This restriction does not allow enough time to produce <br /> � � materials to meet shipments. Mining sand and gravel <br /> is normally performed in above-freezing weather, <br /> limiting production to about eight (8) months a year. <br /> The planned production plant is an all electric plant <br /> and does not emit loud noise. <br /> The loadout loaders and stripping equipment are small <br /> diesel engines. These units will be operated in day- <br /> light hours. All equipment meets the noise levels <br /> established by the I'ederal Agency "MSHA" . <br /> VULCAN TERIALS C MPANY <br /> By: , <br /> ° ° Dani 1 . Roadruck <br /> Vice Presi:dent/Indiana <br /> -2- <br />