Laserfiche WebLink
, � ' <br /> (B) LIFT STATION AND FORCEMAIN CONSTRUCTION <br /> Item Unit uantit Unit Cost Estimated Cost <br /> 1 . Lif t Station (lif t <br /> stations shall include <br /> the pumps , guide rails , <br /> lifting chains , ductile <br /> iron piping and fittings , <br /> valves , valve vault, <br /> alarms , control panels , <br /> float switches, vents , <br /> drains , precast concrete <br /> sections , access covers , <br /> site restoration and seeding, <br /> fenre, and other itens <br /> that are required for a <br /> complete installation L. S. 1 26 ,000. 00 26 ,000. 00 <br /> 2. 4-inch nominal diameter <br /> ductile iron forcema.in L.F. 1202 10. 00 12 ,020. 00 <br /> 3. Air release valve and <br /> vault complete-in- <br /> place ready for <br /> service Ea. 1 1 , 100. 00 1 ,100. 00 <br /> 4. Clay drainage tile <br /> repair (repair shall <br /> include clay pipe, <br /> select granular backfill, <br /> claq pipe bedding <br /> materials shown on plans , <br /> all labor, excavation, <br /> and transportation) Ea. 2 500. 00 1 ,000 . 00 <br /> TOTAL ITEM B: $40 , 120 . 00 <br /> C. DRAINAGE AND STORM SEWER COPISTRUCTION <br /> 1 . 12-inch nominal diameter <br /> storm sewer (R.C.P. <br /> Class III) L.F. 913 23. 00 20 ,999. 00 <br /> �. Precast reinforced <br /> concrete 12-inch nominal <br /> diameter flared end section <br /> complete with end block Ea. 1 300 . 00 300. 00 <br /> 3 . Storm sewer headwall <br /> complete-in-place Ea. 1 2 ,000 . 00 2 ,004. 00 <br /> (�) <br />