My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-103 ACCEPTING THE BID AND AUTHORIZING A CONTRACT R.W. DUNTEMAN COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-103 ACCEPTING THE BID AND AUTHORIZING A CONTRACT R.W. DUNTEMAN COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 10:03:48 AM
Creation date
9/13/2016 10:03:13 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-103
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH R.W. DUNTEMAN COMPANY FOR LOCAL MOTOR FUEL TAX STREET IMPROVEMENTS (ASPHALT) CITY PROJECT 2016-25
Approved Date
8/29/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� INFORMATION FOR BIDDERS <br /> The Owner will make such investigations as deemed necessary to determine the ability of <br />' i the Bidder to perform the work, and the Bidder shall furnish to the Owner all such information <br /> and data for this purpose as the Owner may request. The Owner reserves the right to reject any <br /> � bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that <br /> such Bidder is properly qualified to carry out the obligations of the Contract and to complete the <br /> work contemplated therein. Conditional bids will not be accepted. <br /> � Each bid must be accompanied with a proposal guaranty either as a properly certified <br /> check made payable to "Treasurer, City of Decatur," Decatur, Illinois, in an amount not less than <br /> � ten (10) percent of the bid; or a cashier's check made payable to "Treasurer, City of Decatur", <br /> Decatur, Illinois, in an amount not less than ten (10) percent of the bid; or a bid bond on a form <br /> approved by the City, executed by a surety company satisfactory to the City, in an amount not <br /> less than ten (10) percent of the bid. Such proposal guarantees, of the three lowest bidders, may <br /> be retained b the Cit for a eriod of 45 da f r th <br /> I , y y p ys a te e date of the bid opening. Checks or bid <br /> bonds from other than the three lowest bidders will be returned by the City within seven(7) days <br /> � after the date of the bid opening. <br /> Simultaneously with the delivery of the executed Contract, the Contractor shall furnish a <br /> � surety bond or bonds as security for faithful performance of this Contract and for the payment of <br /> all persons performing labor on the project under this Contract and furnishing materials in <br /> connection with this Contract, and other items required by the Conditions and Specifications <br /> � governing the work. The surety on such bond or bonds shall be a duly authorized surety <br /> company satisfactory to the Owner. Attorneys-in-fact who sign bid bonds or contract bonds <br /> must file with each bond a certified and effectively dated copy of their Power of Attorney. <br /> ' The successful Bidder, upon Bidder's failure or refusal to execute and deliver the Contract and <br /> bonds required within ten (10) consecutive calendar days from and including the date the Bidder <br /> � has received notice of the acceptance of their bid, shall forfeit to the Owner, as liquidation of <br /> damages done for such failure or refusal, the security deposited with their bid. Notice of the <br /> Owner's intent shall either be hand-delivered by the Owner to the Bidder's address, as given on <br /> � the Contract Documents, or mailed to such address, first class, United States mail, return receipt II <br /> requested. Delivery or mailing of said notice to said address shall constitute the notice herein <br /> required without the requirement of an acknowledgment of receipt from the Bidder. � <br /> � Each Bidder must inform himself full of the conditions and s ecifications relatin to the <br /> Y P g <br /> construction of the project and the employment of labor thereon. Failure to do so will not relieve <br /> � a successful Bidder of their obligation to furnish all material and labor necessary to carry out the <br /> provisions of the Contract. Insofar as possible, the Contractor, in carrying out their work, must <br /> employ such methods or means as will not cause any interruption of or interference with the <br /> � work of any other Contractor. <br /> 1 The quantities appearing in the bid proposal are approximate and are prepared for the <br /> comparison of bids. Payment to the Contractor will be made only for the actual quantities of <br /> work performed and accepted or matenals furnished according to the contract. The proposed <br /> � quantities of work to be done and materials to be furnished may each be increased, decreased, or <br /> omitted as hereinafter provided. <br /> � <br /> � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.