Laserfiche WebLink
Project Name: Local Motor Fuel Tax Street Improvement Project,Asphalt <br /> Engineer's Estimate R W Dunteman Co. <br /> Project Number: 2016-25 600 S Lombard Road <br /> Addison,IL 60101 <br /> City Engineering <br /> Bid Date: Wed.07/20/2016 Division Ph. 630-953-1500 <br /> ime: 30:OOA.M. Roland W.Dunteman,Pres <br /> rdunteman@rwdco.com <br /> Fund: Local MFT,Storm Sewer,San.Sewer,Water Non Lake Capital <br /> Organization Code: 42484206,78487906,79487906,81808318 <br /> Object Code: 489070,489040,489030,488800 <br /> Item Pay Item QTY Unit Unit Price Total Unit Price Total <br /> Number <br /> 40600982 HOT MIX ASPHALT SURFACE REMOVAL-BUTT JOINT 67.22 SQ YD $25.00 $1,680.50 $57.15 $3,H41.62 <br /> 40603310 HOT MIX ASPHALT SURFACE COURSE,MIX"C",N50 443.99 TON $107.00 $47,506.93 $99.50 $44,177.01 <br /> 44000155 HOT MIX ASPHALT SURFACE REMOVAL 1-1/2 INCH 5,285.56 SQ YD $3.90 $20,613.68 $4.68 $24,736.42 <br /> 60255800 MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, 1.00 EACH $1,650.00 $1,650.00 $1,525.00 $1,525.00 <br /> LOSED LID <br /> 60300410 ALVE BOX FRAMES TO BE ADJUSTED WITH NEW FRAMES 6.00 EACH $1,730.00 $10,380.00 $1,175.00 $7,050.00 <br /> ������� <br /> OTAL BASE BIDS(AS CORRECTED) $958,150.49 $896,317.96 <br /> Percent Over Under ENGINEER'S ESTIMATE C������� -6.45�'0 <br /> ��L.���I� <br /> OTAL ALTERNATE BIDS(AS CORRECTED) $84,254.18 $81,796.64 <br /> Percent Over Under ENGINEER'S ESTIMATE ������C� -Z'9Zq° <br /> ������ <br /> OTAL BASE BIDS+ALTERNATE BIDS (AS CORRECTEO) $1,042,404.67 $978,114.60 <br /> Percent Over Under ENGINEER'S ESTIMATE -6.179�a <br /> �iG��'l f `-� �s��GG�� �-- 2/-/� <br /> Matthew C. Newell, P.E., City Engineer Date <br /> Page 2 of 2 <br />