Laserfiche WebLink
and gutter, and catch basins along the streets that will be paved as part of the 2016 Local Motor <br /> Fuel Tax Street Improvement Project (Asphalt), City Project 2016-25. In total, 0.13 lane miles of <br /> the City's 825 total lane miles will be rehabilitated as part of this project with much of the work <br /> being done to assist the work on the Asphalt Project list. <br /> Following are the proposed locations where concrete work will be performed, (see attached location <br /> maps): <br /> Length Length <br /> Street Begin End Type of Work (feet) �Lane <br /> Miles <br /> Cleveland Ave. MLK Jr. Dr. Webster St. Curb Ramps <br /> Forest Ave. Westlawn Ave. Dennis Ave. Curb Ramps and Catch <br /> Basins <br /> Cerro Gordo St. Oakland Ave. Dunham St. Pavement Patches and <br /> Curb Ram s <br /> Leafland Ave. Church St. Water St. Pavement Patches and <br /> Curb Ram s <br /> Olive St. Dead End Monroe St. Pavement Patches and <br /> Curb Ram s <br /> Huron St. Grand Ave. Center St. Pavement Patches and <br /> Curb Ram s <br /> Waggoner St. Dead End Huron St. Pavement Patches, Curb <br /> Ram s, and Catch Basins <br /> Harison Ave. Oak Crest Ct. Summit Ave. Curb Ramps <br /> Benton Dr. Mound Rd. Ratchford Ln. Curb Ramps <br /> Robinson Ave. Country Club Rd. Melwood Ave. New Curb <br /> Allen Bend Pt. Allen Bend Dr. Cul-de-sac Concrete Pavement 351 0.13 <br /> Reconstruction <br /> Total Length 351 0.13 <br /> Website <br /> A website has been set up to track the progress of the projects being funded by the local motor fuel '�, <br /> tax, www.buildingdecatur.com. It will contain project updates along with photos and videos. �� <br /> � 2 � <br />