Laserfiche WebLink
. r � <br /> 2 I <br /> DIVISION 2 PUMP STATION & FORCE MAIN <br /> Item Approx. Unit <br /> No. Quantity Description Price Total <br /> 50 . LS Package Type Pump Station $ L.S. $24 , 000 <br /> 51 . LS Pump Station Site Work L.S. 6 ,000 <br /> 52 . 2, 673 LF 4 " rorce Main 6. 50 17, 375 <br /> 53 . 1, 620 LF Compaction-rorce D4ain Tr. Back <br /> Backfill 0. 80 1, 296 <br /> 54 . 80 LF 12" Steel Casing (B & J) 150 . 00 12 , 000 <br /> 55 . 80 CY Trench Backfill 13 . 00 1, 040 <br /> 56 . 1 Ea Air Release Valve & Manhole 1, 000 . 00 1, 000 <br /> 57 . 40 SY 8" Aggregate Base Course <br /> (TY• B) • 9 .00 360 <br /> 58 • 40 SY Incidental Bit Surfacing (C1 .1) 9. 00 360 <br /> 59. 40 SY 8 " Aggregate Surface Course <br /> �TY• B) • 9 . 00 360 <br /> 60 . 84 LF 12" CP�IP Culvert 11. 00 924 <br /> 61 . 8 Ea Metal End Sections (12") 80 . 00 640 <br /> 62 . 0 . 7 Ac Clearing 2 , 000 . 00 1 , 400 <br /> 63 . LS Connection to Exist. Manhole L.S . 500 ' <br /> 64 . LS Grass Surface Restoration L. S. 750 ', <br /> Sub-Total (Division 2) $ 68 , 005 <br /> TOTAL ESTIMATED CONSTRUCTION COST • $ 970, 416 <br /> 65 . Engineering & Inspection 91 ,400 <br /> 66 . Resident Engineering 57 , 000 <br /> 6� • Right-of-Way Costs for easements 11 , 500 <br /> 68 • Court Costs, legal & all costs of <br /> making assessment 57 , 500 <br /> TOTAL ESTIMATED COSTS $1, 187 , 816 <br />