Laserfiche WebLink
. ' . <br /> or above the building g=ade if there is no basement, as <br /> follows : <br /> Single story $14 <br /> Two Stories $20 <br /> � More than two stories $.20 plus $5 for each story <br /> over two <br /> (c) For permits to move structures the amount shall <br /> be based upon the cost of moving with the cost of the new <br /> foundation added thereto and shall be at the rate of $1 .00 for <br /> each $100 of said total cost. <br /> (d) For• permits to erect tents, air supported or <br /> other temporary structures the amount shall be $50. <br /> Section 10 . Should any work for which a permit is required <br /> be commenced or be done before such permit is issued and obtained <br /> the required permit may nonetheless be issued for such and <br /> subsequent work, however the amount of the required fee as provided <br /> herein for all work both that commenced before and that proposed to <br /> be done after said permit is .issued sha1L be �double that otherwise <br /> so provided, and issuance of such permit shall not, and .shall not <br /> be construed to be, an excuse from, or waiver of, or defense to or <br /> absolution from any penalty, liability or action otherwise provided <br /> for in said Code or this ordinance but shall be cummulative of and <br /> in addtion thereto. <br /> Section 11. Notwithstanding any other provision of this or <br /> any other ordinance of the City, whenever site improvements are <br /> - 6 - <br />