My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
77-188 PROVIDING FOR THE LOCAL IMPROVEMENT KNOWN AND DESIGNATED AS SOUTHSIDE SPECIAL ASSESSMENT SANITARY SEWER DISTRICT
COD
>
City Clerk
>
ORDINANCES
>
1977
>
77-188 PROVIDING FOR THE LOCAL IMPROVEMENT KNOWN AND DESIGNATED AS SOUTHSIDE SPECIAL ASSESSMENT SANITARY SEWER DISTRICT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 10:14:10 AM
Creation date
10/6/2016 10:14:09 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
77-188
Res Ord Title
PROVIDING FOR THE LOCAL IMPROVEMENT KNOWN AND DESIGNATED AS SOUTHSIDE SPECIAL ASSESSMENT SANITARY SEWER DISTRICT
Approved Date
10/24/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMOUNT UNIT ITEM LTNIT PRICE TOTAL <br /> 80 L.F. 15-in. Pipe �ulverts $ 1�6.00 $ 1,280.00 <br /> 150 L.F. 18-in. Pipe Culverts $ 19.50 $ 2,925.00 <br /> 10 L.F. 24-in. Pipe Culverts $ 28,25 $ 282.50 <br /> 3600 C.Y. Granular Cradle � $ 11.50 $ 41,400.00 <br /> 7300 C.Y. Selected G.ranular Backfill $ 9.75 $ 71,175.00 <br /> 300 L.F. 4-in. Cast Iron Water ?�iain $ 8.25 $ 2,475.00 <br /> 70 L.F. 3/4 in. Copper Service Pipe $ 7.25 $ 507.50 <br /> 88 C.Y. Class X Concrete Encasement $ 175.00 $ 15,400.OQ <br /> 2 Ea. Pipe Hangers $ 1E�5.00 $ 330.00 <br /> 1280 L.F. 2�-in. P.V.C. Force Main $ 5 .25 $ 6,720.00 <br /> 1 Ea. Lift Station $ 9, 700.00 $ 9,700.00 <br /> 11 Acre Fertilizin and Seedin <br /> g g $ 925.00 $ 10,175.00 <br /> 1400 S.Y. Pavement Removal and Replacement-2-in. Bituminous <br /> Concrete Surface Course Class 1 on 8-in. Aggregate <br /> Base Course Type A $ 34.00 $ 47,600.00 <br /> 960 S.Y. Pavement Removal and Replacement - 6-in. Aggregate <br /> Surface Course Type A $ 4.25 $ 4,080.00 <br /> 50 S.Y. Pavement Removal and Replacement - 6-in. P.C. �'� <br /> Concrete $ 39.50 $ 1,975.00 '� <br /> 10,000 Gal. Bituminous �faterials - Prime eoat <br /> $ 1.25 $ 12,500.00 <br /> 27,000 GaI. Bituminous Materials - Cover and Seal Coats $ 1,25 $ 33,750.00 <br /> 1,250 Ton Cover Coat A.�gregate and Seal Coat Aggregate $ 13.00 $ 16,250.00 <br /> 1 Lump Land Elearing <br /> $13,550 .00 $ 13,550.00 <br /> 380 C.Y. Temporary Surface over Trench <br /> $ 11.00 $ 4,180.00 <br /> 7 Ea. Water Main Taps $ 53. 75 $ 376.25 <br /> 108 Ea, 12-in. Steel End Sections $ 86.00 $ 9,288.00 <br /> 6 Ea. 15-in. Steel End 9ections $ 105.00 $ 630.00 <br /> 4 Ea. 18-in. Steel End Sections $ 135.00 $ 540.00 <br /> 2 Ea. 24-in. Steel End 9ections $ 190.00 $ 380.00 <br /> Total Estimated Construction Cost $1,120,095.75 <br /> Estimated Cost of Right-Of-Way $ 11,700.00 <br /> Court Costs, Legal Expense and all Lawful Costs of Making Assessment $ 67,205.75 <br /> Engineering - Design and Planning $ 89,326.22 <br /> Resident Engineering $ 39 ,203.35 <br /> Total Project Cost $1,327,531.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.