Laserfiche WebLink
' <br /> ' <br /> Return all required MBE forms with the bid. Make certain that all information is filled out <br /> � properly and include all necessary documentation. <br /> Question was asked about if the sub-contracting of traffic control need to meet the 10% <br /> � Subcontracting Goal. Answer: To rent tra�c control it would not be necessary to meet the <br /> subcontracting goals due to the traffic control would be considered a material; the material can <br /> even be delivered to site. If the supplier were to set up the tra�c control then it would be <br /> � considered subcontracting work and would need to meet the minority subcontr�acting goal. Also, <br /> a work task would need to meet the minoriry subcontracting goals is if the task would be <br /> required to pay prevailing wage. <br /> � Meeting Ended at 11:00 a.m. <br /> ' <br /> ' I'I <br /> ' <br /> 1 <br /> , <br /> ' <br /> ' <br /> ' <br /> , <br /> ' <br /> t <br /> ' <br /> ' <br />