<br /> Scction 5 - Ciearwell
<br /> Item Descriptior� Total
<br /> E-37 For the construction of tlie prestressed concrete reservoir
<br /> to serve as the cle�r4�rell , to supply all labor, equipn�ent
<br /> and materials to erect a prestressed concrete covered tank,
<br /> 142 feet inside dia�rcter and 25 Feet - 5 inches inside ��1all
<br /> heiyht, includiny �yall sleeves, underfloor piping, arichor
<br /> bolts , and o?her built-in �ccess��ries , ircluding exca�iation
<br /> for the structure, backfill , granular backfill , granular fill ,
<br /> granular sub-base and peripheral drain, and all incidental
<br /> and appurtenant items, all complete in place as specified,
<br /> for the lump sum of $ 500,000.00
<br /> E-3s For the furnishing and installation of all mechanical items
<br /> in the clearwell , including inside piping; outside piping to
<br /> the limits specified , ladder, ventilator, overflow, and other
<br /> accessories and all incidental and appurtenant items, all
<br /> complete in place as specified, for the lump sum of 50,000.00
<br /> Section 6 - Return blater Pump Station
<br /> E-39 For the construction of the return water pump station �uild-
<br /> ing, approximately 14 feet in diameter by 35 feet in height, of
<br /> reinforced concrete construction, including all architectural
<br /> work, building mechanical work and other building accessories,
<br /> and all incidental and appurtenant items, all complete in place
<br /> as specified, for the lump sum of 15,000.00
<br /> E-40 For the furnishing and installation of one (1) 1250 gpm pump- .
<br /> ing unit, including pump, motor, gauges (starters and electric
<br /> controls not included) using Peerless pump and General Dynamics
<br /> vertical motor, all complete in place as specified, for the
<br /> lump sum of ' 2,000.00
<br /> E-41 For the furnishing and installation of piping, valves, fittings
<br /> and other piping and mechanical equipment in the return water
<br /> � pump station building and to a location five (5) feet outside
<br /> building lines, and building service line and all incidental
<br /> and appurtenant items, all complete in place as specified, for
<br /> the lump sum of 2,000.00
<br /> E-42 For the furnishing and installation of the electric power and
<br /> lighting system, in the return water pump station, including
<br /> main power source to switchgear, 480 volt power feeder, 11�
<br /> volt power and lighting circuits, and including all motor start-
<br /> ers and controls, and all incidental and appurtenant items, all
<br /> complete in place as specified, for the lump sum of 10,000.00
<br /> Section 7 - Sludge Lagoons
<br /> E-43 360o tons, more or less, of aggregate surface course, Type B,
<br /> for the Access Road, all complete in place as specified, for the
<br /> unit price per ton of $5.00 18,000.00
<br /> E-44 2146 lineal feet, more or less, of 15" VCP Sewer, C-13, Class "B"
<br /> Bedding, for the Lagoon Supernatant Pipe Line, all complete in
<br /> place a� specified, for the unit price per lineal foot of $9.00 1g,314.00
<br /> E-45 515 lineal fieet, more or less, of 12" VCP Sewer, Class C-13,
<br /> Class "B" Bedding, for the Lagoon Supernatant Pipe Line, all com-
<br /> plete in place as specified for the unit price per lineal foot
<br /> of $7.00 3,605.00
<br /> E-46 1686 lineal feet, more or less, of 24" Ductile Iron Pipe, Class 1 ,
<br /> South of MH 10, for the Treatment Basin Drain Lines, complete in
<br /> place as specified, for the unit price per lineal foot of $25.00 42, 150.00
<br /> E-47 300 lineal feet, more or less, of' 12" Ductile Iron Pipe, Class 2,
<br /> for the Treatment Basin Drain Lines, complete in place as specified,
<br /> for the unit price per lineal foot of $15.00 4,500,00