My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-124 AUTHORIZING THE EXECUTION OF CONTRACT WITH BODINE COMMUNICATIONS FOR THE SOUTH WATER TREATMENT PLANT SECURITY CAMERA UPGRADE CITY PROJECT 2016-38
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-124 AUTHORIZING THE EXECUTION OF CONTRACT WITH BODINE COMMUNICATIONS FOR THE SOUTH WATER TREATMENT PLANT SECURITY CAMERA UPGRADE CITY PROJECT 2016-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 2:24:50 PM
Creation date
10/21/2016 10:09:09 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-124
Res Ord Title
AUTHORIZING THE EXECUTION OF CONTRACT WITH BODINE COMMUNICATIONS FOR THE SOUTH WATER TREATMENT PLANT SECURITY CAMERA UPGRADE CITY PROJECT 2016-38
Approved Date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> THIS CONTRACT, made and entered into this day of 2016, by and <br /> between the City of Decatur, Illinois, hereinafter called "Owner", and Bodine Communications. <br /> hereinafter called the"Contractor". a iv o a je Enterpriso <br /> WITNESSETH: <br /> That for and in consideration of the payments, covenants, and agreements stated herein, <br /> the Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a Good and Workmanlike Manner <br /> all Work required in connection with "2016, SOUTH WATER TREATMENT <br /> PLANT SECURITY CAMERA UPGRADE CITY PROJECT 2016-38", all <br /> in strict accordance with the Contract Documents, including any and all Addenda <br /> prepared by the City Engineer, with specifications and drawings are made a part <br /> of this Contract; and in strict compliance with the Contractor's Bid Proposal and <br /> the other Contract Documents herein mentioned, which are a part of the Contract; <br /> and the Contractor shall do everything required by this Contract and the other <br /> documents constituting a part thereof. <br /> 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract, <br /> or as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written <br /> Notice to Proceed from the Owner to the Contractor. Upon receipt of said Notice, <br /> the Contractor shall diligently and continuously prosecute and substantially <br /> complete all Work under this Contract. <br /> 4. A Completion Date is in effect for this project in accordance with Section 108 <br /> of the Illinois Department of Transportation, Standard Specifications for <br /> Road and Bridge Construction. Work shall be complete by July 1,2018. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> Contract Documents, all of which are as full a part of this Contract as if herein set <br /> out verbatim, or if not attached, as if hereto attached: <br /> Information for Bidders Special Conditions <br /> Non-Collusion Affidavit General Conditions <br /> Contract(This Instrument) Project Drawings <br /> Contract Change Orders Appendix(s) <br /> Performance Bond <br />
The URL can be used to link to this page
Your browser does not support the video tag.