Laserfiche WebLink
Exhibit H <br /> Exhibit H <br /> DIRECT HOURLY LABOR COSTS OF THE CONSULTING ENGINEER <br /> As of the date of this contract. <br /> Project Name: Fulton Area Drainage Improvements—Phase 2 <br /> Consulting Engineer: Chastain&Associates LLC <br /> Classification Minimum Maximum <br /> Project Principal 70.00 71.00 <br /> Sr.Project Manager 64.00 66.50 <br /> Project Manager II 44.80 50.00 <br /> Project Manager I 46.50 46.50 <br /> Project Engineer II 34.00 40.00 <br /> Project Engineer I 33.70 33.80 <br /> Engineer 23.40 28.50 <br /> Chief of Survey 36.00 36.00 <br /> Surve or 1 28.00 28.20 <br /> Senior Tech. 48.50 48.50 <br /> Tech. IV 38.60 42.00 <br /> Tech. III 35.00 36.40 <br /> Tech. II 29.50 31.70 <br /> Tech. I 15.00 25.90 <br /> Administrative 15.50 28.80 <br /> H-1 <br />