.3 other property at the site or adjacent thereto,such as trees, shrubs,lawns,walks,pavements, <br /> roadways,structures and utilities not designated for removal,relocation or replacement in the course <br /> of construction. <br /> § 10.2.2 The Contractor shall comply with and give notices required by applicable laws,statutes,ordinances,codes, <br /> rules and regulations,and lawful orders of public authorities bearing on safety of persons or property or their <br /> protection from damage,injury or loss. <br /> § 10.2.3 The Contractor shall erect and maintain,as required by existing conditions and performance of the Contract, <br /> reasonable safeguards for safety and protection,including posting danger signs and other warnings against hazards, <br /> promulgating safety regulations and notifying owners and users of adjacent sites and utilities. <br /> § 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are <br /> necessary for execution of the Work,the Contractor shall exercise utmost care and carry on such activities under <br /> supervision of properly qualified personnel. <br /> § 10.2.5 The Contractor shall promptly remedy damage and loss(other than damage or loss insured under property <br /> insurance required by the Contract Documents)to property referred to in Sections 10.2.1.2 and 10.2.1.3 caused in <br /> whole or in part by the Contractor,a Subcontractor,a Sub-subcontractor,or anyone directly or indirectly employed <br /> by any of them,or by anyone for whose acts they may be liable and for which the Contractor is responsible under <br /> Sections 10.2.1.2 and 10.2.1.3,except damage or loss attributable to acts or omissions of the Owner or Architect or <br /> anyone directly or indirectly employed by either of them,or by anyone for whose acts either of them may be liable, <br /> and not attributable to the fault or negligence of the Contractor.The foregoing obligations of the Contractor are in <br /> addition to the Contractor's obligations under Section 3.18. <br /> § 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty <br /> shall be the prevention of accidents.This person shall be the Contractor's superintendent unless otherwise <br /> designated by the Contractor in writing to the Owner and Architect. <br /> § 10.2.7 The Contractor shall not permit any part of the construction or site to be loaded so as to cause damage or <br /> create an unsafe condition. <br /> § 10.2.8 INJURY OR DAMAGE TO PERSON OR PROPERTY <br /> If either party suffers injury or damage to person or property because of an act or omission of the other party, or of <br /> others for whose acts such party is legally responsible,written notice of such injury or damage,whether or not <br /> insured,shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice <br /> shall provide sufficient detail to enable the other party to investigate the matter. <br /> § 10.3 HAZARDOUS MATERIALS <br /> § 10.3.1 The Contractor is responsible for compliance with any requirements included in the Contract Documents <br /> regarding hazardous materials.If the Contractor encounters a hazardous material or substance not addressed in the <br /> Contract Documents and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or death <br /> to persons resulting from a material or substance,including but not limited to asbestos or polychlorinated biphenyl <br /> (PCB),encountered on the site by the Contractor,the Contractor shall,upon recognizing the condition,immediately <br /> stop Work in the affected area and report the condition to the Owner and Architect in writing. <br /> § 10.3.2 Upon receipt of the Contractor's written notice,the Owner shall obtain the services of a licensed laboratory <br /> to verify the presence or absence of the material or substance reported by the Contractor and,in the event such <br /> material or substance is found to be present,to cause it to be rendered harmless.Unless otherwise required by the <br /> Contract Documents,the Owner shall furnish in writing to the Contractor and Architect the names and qualifications <br /> of persons or entities who are to perform tests verifying the presence or absence of such material or substance or <br /> who are to perform the task of removal or safe containment of such material or substance.The Contractor and the <br /> Architect will promptly reply to the Owner in writing stating whether or not either has reasonable objection to the <br /> persons or entities proposed by the Owner.If either the Contractor or Architect has an objection to a person or entity <br /> proposed by the Owner,the Owner shall propose another to whom the Contractor and the Architect have no <br /> reasonable objection.When the material or substance has been rendered harmless,Work in the affected area shall <br /> resume upon written agreement of the Owner and Contractor.By Change Order,the Contract Time shall be <br /> Init. AIA Document A201 T —2007.Copyright©1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987,1997 and 2007 by The American <br /> Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 29 <br /> reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to <br /> the maximum extent possible under the law.This document was produced by AIA software at 15:14:50 on 11/01/2016 under Order No.4982744446 1 which <br /> expires on 07/01/2017,and is not for resale. <br /> User Notes: (2035499384) <br />