My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-01 Contract with SAK Construction 7th Ward Sewer Rehabilitation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-01 Contract with SAK Construction 7th Ward Sewer Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:37:25 PM
Creation date
1/20/2017 3:38:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-01
Res Ord Title
Contract with SAK Construction for 7th Ward Sewer Rehabilitation Project CP 2015-07
Department
Public Works
Approved Date
1/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r8_GM <br /> &ASSOCIATES,INC. <br /> January 5,2017 <br /> The Honorable Mayor Julie Moore-Wolfe and City Council <br /> 1 Gary K Anderson Plaza <br /> Decatur,IL 62523 <br /> RE: Recommendation of Project Award <br /> 7th Ward Sewer Rehabilitation Project <br /> City Project 2015-07 <br /> Dear Mayor and City Council: <br /> Competitive bids for the 7th Ward Sewer Rehabilitation project were opened December 13,2016,at 10:00 AM at the <br /> Public Works Department. The project is comprised of a single contract to be awarded to the lowest responsive, <br /> responsible bidder. Eight bids were received,and there were no irregularities in the bidding process. <br /> The work under this contract was estimated at$13,731,320. The lowest bid was from SAK Construction, LLC, of <br /> O'Fallon, Missouri, at $7,746,486 (43.6% below the estimate). The next lowest bid was from Insituform <br /> Technologies USA, LLC, of Chesterfield, Missouri, at $8,391,660.20 (38.9% below the estimate). Three other bids <br /> were made in the$9.4 million to$9.7 million range;two bids were in the low$13 million;and one bid was at$14.4 <br /> million. <br /> A comparison of the bids to the engineer's estimate shows that main cost differences were in the sewer cleaning and <br /> the large diameter CIPP liners(from 50"to 84"). SAK's costs for these items was 41%lower than the estimate. The <br /> spread in the five lowest bidders for these items was 17%,which suggests that SAK's overall bid price is reasonably <br /> consistent with the other lower bidders. It also indicates a high degree of competition. When SAK is excluded, the <br /> spread between the four other lower bidders drops to 11%,again suggesting reasonable and very competitive bids. <br /> SAK Construction, LLC, has performed similar work for the City in the recent past on the Lake Shore Drive Sewer <br /> Rehabilitation project completed in 2012, which included sewers of similar diameter. SAK is a known contractor <br /> with a proven record,and is fully capable of performing high quality work in a timely and professional manner. <br /> We recommend that the City of Decatur notify SAK Construction, LLC,as the lowest responsive,responsible bidder, <br /> of its intent to award this contract to SAK contingent upon approval by the Illinois Environmental Protection Agency <br /> and receipt of a loan offer by IEPA. <br /> We would like to thank the City of Decatur for this opportunity to be of service. <br /> Very truly yours, <br /> BGM&Associates,Inc. <br /> By: % ^' ` <br /> H.David Harp,P. 4 <br /> E. <br /> Cc: Tim Gleason,City Manager <br /> Rick Marley,PE,Public Works Director <br /> Matt Newell,PE,City Engineer <br /> Paul Caswell,PE,Assistant City Engineer <br /> Heidi Allen,IEPA <br /> 5130 Hickory Point Frontage Rd.,Ste.2 • Decatur,IL 62526 • Office-217/423-8600 Fax-217/423-8677 www.bgm,associates <br /> Building Tomorrow. Today. <br />
The URL can be used to link to this page
Your browser does not support the video tag.