Laserfiche WebLink
i <br /> 11. Authority and Responsibility. The Consulting Engineer shall not guarantee the work of any <br /> Contractor or Subcontractor, shall have no authority to stop work, shall have no supervision or <br /> control as to the work or persons doing the work, shall not have charge of the work, shall not be <br /> responsible for safety in, on, or about the job-site or have any control of the safety or adequacy of <br /> any equipment, building component, scaffolding, supports, forms or other work aids,and shall <br /> have no duties or responsibilities imposed by the Structural Work Act upon the "owner" under <br /> that Act and shall not be the "person in control of work"within the meaning of that Act. <br /> 12. Consulting Engineer Not Responsible for Acts of Contractor. The Consulting Engineer shall not <br /> be responsible for the supervision or control of the acts or omissions or construction means, <br /> methods or techniques of any Contractor, or Subcontractor, or any of the Contractor(s)' or <br /> Subcontractors' agents or employees or any other person(except the Consulting Engineer's own <br /> employees and agents)at the site or otherwise performing any of the Contractor(s)'work; <br /> however,nothing contained in this contract shall be construed to release the Consulting Engineer <br /> from liability for failure to properly perform duties undertaken by him in these Contract <br /> Documents or this Agreement. <br /> 13. Preparation of Record Drawings. The Consulting Engineer shall prepare a set of record plans on <br /> which shall be noted all changes which may have occurred during construction. The record <br /> drawings need not detail changes in measurements, elevation lines or grades which are within the <br /> normally accepted construction tolerances. Record drawings may be prepared using AutoCAD or <br /> other electronic plan preparation method. Alternately,record drawings may be prepared using <br /> manual methods. The plans shall be delivered to the City's Representative in the form of one set <br /> of prints and electronic file if record drawings were prepared by electronic methods. The cost of <br /> document reproduction shall be considered to be a reimbursable expense and paid in accordance <br /> with Section V(C)of this agreement. <br /> 14. Completion Time. The Consulting Engineer shall complete the Construction Inspection Phase <br /> within the time period set forth in Exhibit C,Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, capacity <br /> and performance requirements,flexibility and expandability, economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> C. FURNISH TECHNICAL INFORMATION. Furnish to the Consulting Engineer, as required for <br /> performance of the Consulting Engineer's Basic Services(except to the extent provided otherwise in <br /> Exhibit A, "Scope of Work"), data prepared by or services of others, including without limitation, <br /> core borings,probings and subsurface explorations,hydrographic surveys, laboratory tests and <br /> inspections of samples, materials and equipment; appropriate professional interpretations of all of the <br /> foregoing; environmental assessment and impact statements; property, boundary, easement,right-of- <br /> way,topographic and utility surveys; property descriptions; zoning, deed and other land use <br /> Last Revised:04/29/2015 <br />