My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-04 Expenditure of Funds for Nelson Park Amphitheater Design
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-04 Expenditure of Funds for Nelson Park Amphitheater Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:47:38 PM
Creation date
1/20/2017 3:47:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-04
Res Ord Title
Expenditure of Funds for Nelson Park Amphitheater Design Project
Department
City Manager
Approved Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Page 2 <br /> PROJECT TEAM <br /> Project responsibilities will be distributed between team members as follows: <br /> Architecturalressions <br /> Exp ,LLP(A—EX) <br /> • Overall project administration,including coordination of team communications. <br /> • Architectural,structural,and engineering services for the stage platform and structure,support buildings, <br /> restroom facilities,retaining wall structures,and electrical infrastructure. <br /> • Construction documentation for the architectural,structural,mechanical and electrical work. <br /> • Bidding phase services,including organizing and handling of bidding documents,preparation and <br /> distribution of addenda,analysis of alternates and substitutions,validation of bids,and assist with the <br /> preparation of construction contract agreements. <br /> • Construction administration services,including project representation,submittal reviews,pay application <br /> processing,construction cost accounting,supplemental documentation,and project closeout.services. <br /> • Site observation services,including scheduled visits to the jobsite to review progress and the quality of <br /> the work,and to assess general conformance with the contract documents. <br /> • Post-contract start-up assistance and record drawing preparation. <br /> Schuler Shook <br /> • Advisory services including audience planning,audience seating,stage planning,production and <br /> performer support area planning,and front-of-house planning. <br /> • Design services,including infrastructure for stage rigging,simple stage rigging systems for basic uses, <br /> stage lighting systems,amphitheater general lighting and seating area lighting. <br /> Threshold Acoustics.LLC <br /> • _ Acoustical consulting services,including acoustic analysis,noise control,and sound isolation. <br /> • Amphitheater shape analysis and design recommendations to support amplified performances. <br /> • Analysis and design recommendations for controlling sound propagation between the new pavilion <br /> location and the existing WPA pavilion. ' <br /> • Acoustical design and analysis of mechanical noise and vibration control of the adjacent support spaces. <br /> • AV consulting services for power and infrastructure design and recommendations for rented systems. <br /> Chastain&Associates <br /> • Civil and site consulting services for the amphitheater,seating areas,and support facilities. <br /> • Design of road and walkway improvements directly associated with the project. <br /> • Design of on-site and off-site water,sanitary and storm drainage utilities. <br /> • Landscape design coordination with park district staff. <br /> • Security fencing design along the perimeter of the facility. <br /> • Construction documentation for civil and site work. <br /> • Construction observation services for civil and site work. <br /> Edgewater Resources <br /> + Master Plan coordination and landscaping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.