My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-24 Bodine Electric High Service Pump Motor Repair
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-24 Bodine Electric High Service Pump Motor Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 4:00:52 PM
Creation date
2/24/2017 4:00:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-24
Res Ord Title
Bodine Electric South Water Treatment Plant High Service Pump Motor Repair
Department
Public Works
Approved Date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The repair will take 6 weeks to complete compared to an estimated delivery time of 24 weeks for a new motor. It is desired <br /> that a motor be in service prior to the start of summer when customer demand for water is highest. <br /> It is recommended that Bodine Electric of Decatur be awarded the repair work for the following reasons: <br /> The City has sought price quotes for the repairs and rehabilitation of many other smaller motors at the SWTP in the last 4 <br /> years. Bodine Electric has consistently been the lowest cost vendor. <br /> Within Decatur, Bodine Electric's shop is well equipped to handle large electric motors. <br /> Bodine can complete the repair work quickly. <br /> For reference, attached are photos of a similar pump motor at the South Water Treatment Plant. <br /> PRIOR COUNCIL ACTION: None <br /> POTENTIAL OBJECTIONS: None <br /> INPUT FROM OTHER SOURCES: <br /> Bodine Electric of Decatur <br /> STAFF REFERENCE: Keith Alexander, Water Production Manager, 424-2863 or kalexander@ decaturil.gov <br /> BUDGET/TIME IMPLICATIONS: The expenditure will be paid from Water Capital Fund 81. <br /> COPY: <br /> Don Giger, Water Production Operations Supervisor <br /> Randy Weaver, Water Production Maintenance Supervisor <br /> Shane Mallory, Bodine Electric of Decatur <br /> ATTACHMENTS: <br /> Description Type <br /> 2017-11 Resolution Resolution Letter <br /> 2017-11 Pump Photos Backup Material <br /> 2017-11 Price Quote Backup Material <br />
The URL can be used to link to this page
Your browser does not support the video tag.