Laserfiche WebLink
1 } Bodine Electric of Decatur <br /> re [ICE 1845 North 22nd Street <br /> PO Box 976 CUSTOMER QUOTATION <br /> Decatur, IL 62525 <br /> Phone:(217)423-2597 <br /> ob: 27471M <br /> Cust #: 017100 Ship To #: 000099 Job Rcvd <br /> CITY OF DECATUR SOUTH WATER TREATMENT 01/12/17 <br /> ONE GARY ANDERSON PLAZA <br /> DECATUR, IL 62523 <br /> ust P.O. P.O. Rel# Misc # Terms Cd <br /> RS95702 NET 10 DAYS <br /> ame late Data: <br /> KE :GE, HP/KW: 700-805, MODEL: SKP21165A523, TYPE :K, FRAME : P211, SPEED: 1185, <br /> OLTS : 4000Y, AMPS : 93 . 0, SERIAL #: 8428982, CYCLE : 60, PHASE : 3, MISC:LRA558 <br /> Special Instructions: <br /> E FOR REPAIR <br /> escri tion Price <br /> ECONDITION LABOR <br /> CHINE SHOP LABOR <br /> ALANCING LABOR <br /> EBAR ROTOR <br /> ICKEL PLATING PER AMP HOUR <br /> ZE SLEEVE <br /> ALL BEARING <br /> ISC MATERIAL <br /> FREIGHT <br /> CONNECT/ DISCONNET <br /> **To include removal, unwiring, <br /> re-installing, rewiring, and laser <br /> alignment of motor. <br /> SCOPE OF REPAIR: Disassemble, steam <br /> clean, bake and test. Reinsulate <br /> indings . Sleeve and machine both <br /> Baring housings . Restack and Rebar <br /> Rotor. Replace bad rotor laminations <br /> s needed. Buildup and machine both <br /> rg Journal Fits . Furnish and install <br /> ew bearings . Balance rotor and <br /> coupling. Reassemble, final testing, and <br /> deliver. <br /> FREIGHT INCLUDED <br /> Continued <br />