Laserfiche WebLink
j6r= ENVIRONMENTAL <br /> Decatur,IL SERVICES° <br /> The following table provides our base 90 day fee for these services in conjunction with this project. <br /> Task Qty Units Unit Cost Total Cost <br /> 1. Flow Monitor Site Investigation, Installation, 86 Each $1,005.00 $86,430.00 <br /> Removal <br /> 2. Flow Monitor Equipment Lease, Data Collects, 258 Per meter $835.00 $215,430.00 <br /> Maintenance, Data Review, /month <br /> 3. Flow Monitoring Data Analysis, Editing, and 258 Per meter $182.00 $46,956.00 <br /> QAQC for"Model Ready"data /month <br /> 4. Rain Gauge Calibration, Per meter <br /> Maintenance, Data Downloads, 45 $540.00 $24,300.00 <br /> Equipment Removal(Includes Installation) /month <br /> 5. Final Report&Final Data Delivery 1 1 Included Included <br /> 90 Day Base Project Total $373,116.00 <br /> 30 Day Extension Costs(offered with a 6%Cost Reduction)assuming all meters remain installed: <br /> Task Qty Units Unit Cost Total Cost <br /> 1. Flow Monitor Equipment Lease, Data Collects, 86 Per meter $784.90 $67,501.40 <br /> Maintenance, Data Review, /month <br /> 2. Flow Monitoring Data Analysis, Editing, and 86 Per meter $171.08 $14,712.88 <br /> QAQC for"Model Ready"data /month <br /> 3. Rain Gauge Calibration, Per meter <br /> Maintenance, Data Downloads, 15 /month $507.60 $7,614.00 <br /> Equipment Removal(Includes Installation) <br /> 30 Day Extension Project Total $89,828.28 <br /> 4-Month Project Total $462,944.28 <br /> The pricing provided in the attached table is based on the following assumptions: <br /> • No local taxes included—Tax Exempt Municipality; <br /> • Report Deliverables are via PDF and Excel Data Deliverables via CD-ROM. <br /> ADS Environmental Services <br />