Laserfiche WebLink
Exhibit A <br /> SCOPE OF WORK <br /> CONSTRUCTION PHASE <br /> The Engineer shall furnish services during the construction period generally comprised of the <br /> following: <br /> a. Consult with the CITY and with the Contractor on interpretation of plans and <br /> specifications regarding any changes under consideration as construction proceeds. <br /> b. Provide resident job-site inspection by the Project Engineer, or his <br /> representatives,during the construction period. <br /> C. Prepare and submit all payment estimates, change orders, records and reports <br /> required by the CITY. <br /> d. Safeguard the CITY against defects and deficiencies on the part of the contractor, <br /> but the ENGINEER does not guarantee the performance of the contract by the contractor. <br /> e. Conduct final inspection of construction and prepare final papers and reports. <br /> f. Revise contract drawings to show location and nature of improvement as actually <br /> constructed and supply "Record" drawings consisting of an electronic file copy and one set of <br /> paper prints to the CITY based on record field drawings maintained by the CITY. <br /> g. Review all shop and working drawings for general conformance with the project <br /> documents. <br /> h. Review and check all reports by testing laboratories on equipment and material <br /> tested. <br /> i. A Resident Project Representative shall be provided, but shall not be onsite at all <br /> times.The duties of the Resident Project Representative as provided shall be to track contract <br /> progress, prepare daily reports, weekly reports, assist with coordinating with contractor the <br /> proper inspections are completed, attend construction meetings, payment estimates, change <br /> orders, field orders, prepare record drawings, close-out documents, and assist with <br /> coordination between the CITY OF DECATUR,SANITARY DISTRICT OF DECATUR, CONTRACTOR, <br /> and ENGINEER. <br /> j. General project staking of line and grade shall be provided. Not more than two <br /> base lines and one bench mark shall be provided at major structures i.e.wet wells, and vaults. <br /> Centerline staking and offsets shall be provided for each sewer mains and roadway alignment. <br /> Last Revised:05-15-2013 A-1 <br />