My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:08:21 AM
Creation date
3/23/2017 9:42:14 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-34
Res Ord Title
Contract with Browning Chapman, LLC, for Parking Garages B & C Structural Improvements City Project 2015-03
Department
Public Works
Approved Date
3/20/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> C:iarl <br /> ' ADDEND <br /> Walkeer UM NO. 1 <br /> ' PROJECT: City of Decatur Illinois, Public Works Department <br /> Parking Garages B &C, Structural Improvements <br /> Carl Walker Project No. R1-2011-482.25 <br /> DATE: February 28,2017 <br /> ' Carl Walker Inc. <br /> 8910 Purdue Road, Suite 400 <br /> ' Indianapolis,IN 46268 <br /> The Bid Documents dated January, 2017,for the above captioned project are hereby amended and/or <br /> ' supplemented by this Addendum No. 1. All applicable provisions of the General and Special Conditions, <br /> Instructions to Bidders,and all other Contract Documents apply to this Addendum as though items included <br /> herein were part of said Contract Documents as originally issued. <br /> ' This Addendum to the Project Manual for this project, modifies and becomes a part of the Bid Documents.Work <br /> or materials not specifically mentioned herein are to be as described in the main body of the Specification, and as <br /> shown on the Drawings <br /> ' Item#1: Project Drawings, Sheet SR102, Level 2 Plan <br /> ' 1.1 Hexagon bubble notes 7 &8,the only instance on the plan, located between gridlines 12 and 13 on <br /> gridline A; is on the wrong level. The work is on Level 3,and should have the same marks and <br /> quantities <br /> END OF ADDENDUM NO.1 <br /> ' RESTORATION&(DRESERVATION Solutions o s Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.