Laserfiche WebLink
1 <br /> C:iarl <br /> ' ADDEND <br /> Walkeer UM NO. 1 <br /> ' PROJECT: City of Decatur Illinois, Public Works Department <br /> Parking Garages B &C, Structural Improvements <br /> Carl Walker Project No. R1-2011-482.25 <br /> DATE: February 28,2017 <br /> ' Carl Walker Inc. <br /> 8910 Purdue Road, Suite 400 <br /> ' Indianapolis,IN 46268 <br /> The Bid Documents dated January, 2017,for the above captioned project are hereby amended and/or <br /> ' supplemented by this Addendum No. 1. All applicable provisions of the General and Special Conditions, <br /> Instructions to Bidders,and all other Contract Documents apply to this Addendum as though items included <br /> herein were part of said Contract Documents as originally issued. <br /> ' This Addendum to the Project Manual for this project, modifies and becomes a part of the Bid Documents.Work <br /> or materials not specifically mentioned herein are to be as described in the main body of the Specification, and as <br /> shown on the Drawings <br /> ' Item#1: Project Drawings, Sheet SR102, Level 2 Plan <br /> ' 1.1 Hexagon bubble notes 7 &8,the only instance on the plan, located between gridlines 12 and 13 on <br /> gridline A; is on the wrong level. The work is on Level 3,and should have the same marks and <br /> quantities <br /> END OF ADDENDUM NO.1 <br /> ' RESTORATION&(DRESERVATION Solutions o s Page 1 of 1 <br />