Laserfiche WebLink
APPENDIX A <br /> ` Photo 1: Beam end damage found during <br /> December 2014 inspection of Parking <br /> Garage C. <br /> t: <br /> �w <br /> wruy Photo 2: Deterioration and heavy rusting <br /> at structural steel joint in Parking Garage <br /> C. <br /> N. <br /> Photo 3: Beam end repair in Parking <br /> Garage C completed by Christy-Foltz in <br /> April 2015. The deteriorated section was <br /> cut out and new structural steel was <br /> bolted in place with a structural steel <br /> support installed to hold the beam in <br /> place. <br /> � 5 � <br />