My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:08:21 AM
Creation date
3/23/2017 9:42:14 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-34
Res Ord Title
Contract with Browning Chapman, LLC, for Parking Garages B & C Structural Improvements City Project 2015-03
Department
Public Works
Approved Date
3/20/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> ` Photo 1: Beam end damage found during <br /> December 2014 inspection of Parking <br /> Garage C. <br /> t: <br /> �w <br /> wruy Photo 2: Deterioration and heavy rusting <br /> at structural steel joint in Parking Garage <br /> C. <br /> N. <br /> Photo 3: Beam end repair in Parking <br /> Garage C completed by Christy-Foltz in <br /> April 2015. The deteriorated section was <br /> cut out and new structural steel was <br /> bolted in place with a structural steel <br /> support installed to hold the beam in <br /> place. <br /> � 5 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.