Laserfiche WebLink
The proposed street list for Street Restoration is as follows see attached location maps): <br /> Street Begin End Surface Treatment Length (feet) Length <br /> Lane Miles <br /> Mound Road Woodford St IL Route 48 Mill and Overlay 6,964 5.46 <br /> Total Length 6,964 5.46 <br /> The proposed locations for crack sealing as part of the Street Restoration project are as follows: <br /> Street Location Length of <br /> road feet <br /> N/S Main Street Between Wood St.and Eldorado St. 1,930 <br /> North Street Between Main St.and Franklin St. 753 <br /> William Street Between Main St.and Franklin St. 747 <br /> Prairie Street Between Alley west of Main St.and Water St. 536 <br /> North Park Street Between Water St.and Franklin St. 320 <br /> South Park Street Between Water St.and Franklin St. 315 <br /> E/W Main Street Between Church St.and Franklin St. 1,128 <br /> Total Length 5,729 <br /> SCHEDULE: <br /> Design work for the 2017 Street Restoration Project is currently underway and the plans will be <br /> advertised forbid once IDOT approves the plans. The projects are planned to begin around the <br /> month of May. <br /> BUDGET/TIME IMPLICATION: <br /> 1. Budget Impact: The proposed resolutions appropriate $750,000 in State Motor Fuel Tax funds <br /> for the Street Restoration project. <br /> 2. Staffing Impact: Staff time has been allocated for managing these projects. <br /> LEGAL REVIEW: Legal review of the State Motor Fuel Tax appropriation is not required. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation <br /> STAFF REFERENCE: Richard Marley, Public Works Director, Matt Newell, City Engineer and <br /> Griffin Enyart, Civil Engineer II. Richard Marley, will be in attendance at the City Council meeting <br /> to answer any questions of the Council on this item. <br /> This memorandum was prepared by Griffin Enyart, P.E., Civil Engineer II. <br /> Attach: 4 <br /> — 2 — <br />