Laserfiche WebLink
BLANK, WESSELINK, COOK <br /> AND ASSOCIATES, INC. <br /> ENGINEERS <br /> CONSULTANT ; <br /> JOSEPH D.CVCOTTE <br /> SCOTT D.RIGHTER <br /> BWC#009-1503 <br /> F/C 8.2 <br /> April 4,2017 <br /> City of Decatur <br /> Public Works Department <br /> #1 Gary K.Anderson Plaza <br /> Decatur,IL 62523 <br /> Attn:Mr.Matthew Newell <br /> RE: Project#2012-22, IEPA Loan No. L 17-5315 <br /> Nelson Park Neighborhood Combined Sewer <br /> Separation Project <br /> Bid Evaluation <br /> Dear Mr.Newell: <br /> This letter is written as requested to evaluate the bids received from Entler Excavating Co.,Inc.,Otto Baum Co., <br /> Inc.,and Freesen,A Division of United Contractors Midwest, Inc. <br /> The overall low project bid from Entler Excavating was 15.41% under our Engineering Estimate. Otto Baum <br /> had the second lowest bid at 7.63% under our Engineering Estimate. Freesen had the highest bid at 3.91% <br /> below our Engineering Estimate. <br /> BWC reviewed the bid tab for City Project 2012-22 and found no errors or omissions with the bids submitted. <br /> Therefore,BWC feels that the overall estimates are valid for this project. <br /> Based upon the above information, BWC recommends that the bid provided by Entler Excavating Co., Inc. be <br /> accepted. <br /> Respectfully submitted, <br /> BLANK, WESSELINK,COOK&ASSOCIATES,INC. <br /> Ryan J.Coo ,P.E. <br /> Project Engineer <br /> rcook@bwcinc.com <br /> (217)428-0973 <br /> 2623 EAST PERSHING ROAD • P.O. BOX 2910 • DECATUR, IL 62524-2910 <br /> PHONE 2171428-0973 • FAx 2171428-8934 <br />