' Affidavit of Availability
<br /> ('� For the Letting of 4/10/2017
<br /> of Tra �}�• `a*m (Letting date)
<br /> t Bureau of Construction Instructions: Complete this form by either typing or using black ink.
<br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this form are
<br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work.
<br /> ' Part 1. Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not
<br /> yet awarded or rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar
<br /> value is to be based upon the most recent engineer's or owners estimate,and must include work subcontracted to others. If no work is
<br /> ' contracted,show NONE.
<br /> 1 2 3 4 Awards Pending
<br /> Contract Number n/a 68B44 CH12 85639
<br /> ' Contract With White Const Mt Carmel Christian Cty IDOT
<br /> Estimated Completion Date 2018 9/17 7117 7/17
<br /> Total Contract Price Accumulated
<br /> 4,890,301.00 461,313.00 393,531.00 794,967.00 Totals
<br /> Uncompleted Dollar Value if Firm is the
<br /> Prime Contractor 393,531.00 794,967.00 1,704,482.00
<br /> Uncompleted Dollar Value if Firm is the
<br /> ' Subcontractor 4,890,301.00 461,313.00 5,909,663.00
<br /> Total Value of All Work 7,614,145.00
<br /> Part H. Awards Pending and Uncompleted Work to be done with your own forces.
<br /> ' List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated
<br /> Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your
<br /> company. If no work is contracted,show NONE. Totals
<br /> ' Earthwork 10,200.00
<br /> Portland Cement Concrete Paving 0.00
<br /> HMA Plant Mix 0.00
<br /> ' HMA Paving 1,076,717.00 1,364,765.00
<br /> Clean&Seal Cracks/Joints 32,274.00
<br /> Aggregate Bases&Surfaces 1,605,455.00 1,648,264.00
<br /> ' Highway,R.R.and Waterway Structures 0.00
<br /> Drainage 0.00
<br /> ' Electrical 0.00
<br /> Cover and Seal Coats 1,686,259.00 1,686,259.00
<br /> Concrete Construction 0.00
<br /> ' Landscaping 0.00
<br /> Fencing 0.00
<br /> ' Guardrail 0.00
<br /> Painting 0.00
<br /> Signing 0.00
<br /> ' Cold Milling,Planning&Rotomilling 511,808.00
<br /> Demolition 0.00
<br /> Pavement Markings(Paint) 3,986.00 3,986.00
<br /> Other Construction(List) 0.00
<br /> Stabilization 461,313.00 461,313.00
<br /> ' CIR 393,531.00 523,585.00 917,116.00
<br /> Totals 4,368,431.00 461,313.00 393,531.00 527,571.00 0.00 6,635,985.00
<br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will
<br /> ' result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center.
<br /> Printed 4/10/2017 Page 2 of 14 BC 57(Rev.08/17/10
<br />
|