My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-88 Agreement with AECOM to Provide Design Services to Improve Mound Road - Spring Creek Bridge CP 2017-06
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-88 Agreement with AECOM to Provide Design Services to Improve Mound Road - Spring Creek Bridge CP 2017-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2017 12:15:13 PM
Creation date
7/14/2017 2:33:19 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-88
Res Ord Title
Agreement With AECOM to provide design services to improve the Mound Road - Spring Creek Bridges CP 2017-06
Department
Public Works
Approved Date
7/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Approvals of Governmental Entities. Furnish to the City's Representative such documents and <br /> design data as may be required for,and assist in the preparation of,the required documents so <br /> that the City may apply for approvals of such governmental authorities as have jurisdiction over <br /> design criteria applicable to the Project,and assist in obtaining such approvals by participating in <br /> submissions to and negotiations with appropriate authorities. <br /> 3. Adjusted Protect Costs. Advise the City's Representative of any adjustments to the latest opinion <br /> of probable Project Costs caused by changes in extent or design requirements of the Project or <br /> construction costs and furnish a revised opinion of probable Project Cost based on the Drawings <br /> and Specifications. Project Costs include construction cost,contingencies, allowances for charges <br /> of all professionals and consultants,allowances for the cost of land and rights-of-way,allowances <br /> for the relocation of utility facilities and equipment if necessary, and allowances for <br /> compensation for damages to properties and interest and financing charges. <br /> 4. Contract Document Preparation. Complete preparation of the construction contract documents by <br /> filling in the necessary information in Parts I,II, and IV of the City's standard CICC. The <br /> Consulting Engineer shall prepare Part 3 "Technical Specification"of the CICC for inclusion in <br /> the standard construction contract. The Consulting Engineer shall not alter the City's standard <br /> contract document without the permission of the City's Representative. The City's <br /> Representative may provide the Consulting Engineer with previously prepared Technical <br /> Specifications which may be used as appropriate. The Consulting Engineer shall,to the <br /> maximum extent possible, follow the formats for Technical Specifications as provided by the <br /> City's Representative. <br /> 5. Document Presentation. Furnish paper copies and digital copies of the CICC in the number and <br /> format specified in Exhibit A, Scope of Work and present and review the CICC in person with the <br /> City as the City's Representative shall direct. The cost of document reproduction shall be <br /> considered to be a reimbursable expense and paid in accordance with Section V(C)of this <br /> Agreement. <br /> b. Completion Time. The Final Drawings and Specifications shall be completed,submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C,Project <br /> Timeline. <br /> C. BIDDING PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Bidding Phase: <br /> 1. Assist in Biddiii . Assist the City's Representative in obtaining bids for each separate City <br /> contract for construction,materials,equipment and services for the Project. <br /> 2. Respond to Questions from Bidders. Receive and respond to questions from prospective bidders <br /> during the bidding period. All responses shall be written and shall be provided to all plan holders <br /> as listed on the Plan Holder List. Questions received five(5) business days before the bid <br /> opening shall be answered. Questions received between four(4)and two(2)business days before <br /> the bid opening may be answered provided that a means exists to communicate the answer in <br /> writing to all the bidders. Questions received one(1)business day before or on the day of the bid <br /> opening shall not be answered.Answers to questions should be distributed to bidders by email, <br /> however if a bidder does not have email service the documents may be transmitted by fax. <br /> Last Revised:04/29/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.