My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-88 Agreement with AECOM to Provide Design Services to Improve Mound Road - Spring Creek Bridge CP 2017-06
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-88 Agreement with AECOM to Provide Design Services to Improve Mound Road - Spring Creek Bridge CP 2017-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2017 12:15:13 PM
Creation date
7/14/2017 2:33:19 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-88
Res Ord Title
Agreement With AECOM to provide design services to improve the Mound Road - Spring Creek Bridges CP 2017-06
Department
Public Works
Approved Date
7/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Municipality L Name <br /> City of Decatur C CO AECOM Technical Services <br /> Township A N Address <br /> L S <br /> Preliminary Engineering U 345 E Ash Ave. Suite B <br /> County A Services Agreement L city <br /> Macon G For T <br /> E Motor Fuel Tax Funds A Decatur <br /> Section N N <br /> C T State <br /> 17-00706-00-BR Y IL <br /> THIS AGREEMENT is made and entered into this day of , c_-)d between the above Local <br /> Agency(LA) and Consultant (ENGINEER) and covers certain profession.*engiifleering services in connection with the <br /> improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general <br /> supervision of the State Department of Transportation, hereinafter called the "DEPARTMENT", will be used entirely or in part <br /> to finance ENGINEERING services as described under AGREEMENT PROVISIONS. <br /> Section Description <br /> Name West and Center Mound Road Structures Deck Replacement and Substructure Repair <br /> Route FAU 7359 Length Mi. FT (Structure No. 058-3035 ) <br /> 058-3036 <br /> Termini <br /> Description: <br /> Replacement of superstructure with substructure repairs for three-span PPC Deck Beam Bridges and necessary roadway <br /> work, submit Hydraulic Report, and perform bridge inspection <br /> Agreement Provisions <br /> The Engineer Agrees, <br /> 1. To perform or be responsible for the performance of the following engineering services for the LA, in connection with the <br /> proposed improvements herein before described, and checked below: See attached Scope of Work <br /> a. ® Make such detailed surveys as are necessary for the preparation of detailed roadway plans <br /> b. ® Make stream and flood plain hydraulic surveys and gather high water data, and flood histories for the preparation <br /> of detailed bridge plans. <br /> c. ❑ Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles and <br /> analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. <br /> Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. <br /> d. ® Make or cause to be made such traffic studies and counts and special intersection studies as may be required to <br /> furnish sufficient data for the design of the proposed improvement.Traffic Signal Timing to be set by the City. <br /> e. ® Prepare Army Corps of Engineers Permit, Department of Natural Resources-Office of Water Resources Permit, <br /> Bridge waterway sketch, and/or Channel Change sketch, Utility plan and locations, and Railroad Crossing work <br /> agreements. <br /> f. ® Prepare Preliminary Bridge design and Hydraulic Report, (including economic analysis of bridge or culvert types) <br /> and high water effects on roadway overflows and bridge approaches. <br /> g. ® Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA <br /> with five (5) copies of the plans, special provisions, proposals and estimates. Additional copies of any or all <br /> documents, if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. <br /> h. ® Furnish the LA with survey and drafts in quadruplicate of all necessary right-of-way dedications, construction <br /> easement and borrow pit and channel change agreements including prints of the corresponding plats and staking <br /> as required. <br /> Note: Four copies to be submitted to the Regional Engineer <br /> Printed 6/15/2017 Page 1 of 4 BLR 05510(Rev. 11/06) <br />
The URL can be used to link to this page
Your browser does not support the video tag.