My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-320 Resolution Authorizing Acceptance of other Associated Costs to Install Fiber Conduit Under Lake Decatur at Lost Bridge Road
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-320 Resolution Authorizing Acceptance of other Associated Costs to Install Fiber Conduit Under Lake Decatur at Lost Bridge Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 4:10:15 PM
Creation date
10/10/2024 4:10:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-320
Res Ord Title
R2024-320 Resolution Authorizing Acceptance of other Associated Costs to Install Fiber Conduit Under Lake Decatur at Lost Bridge Road
Department
Public Works
Approved Date
10/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. R20-1-3a-o <br /> RESOLUTION AUTHORIZING ACCEPTANCE OF OTHER ASSOCIATED COSTS TO <br /> INSTALL FIBER CONDUIT UNDER LAKE DECATUR AT LOST BRIDGE ROAD <br /> WHEREAS, the City owns,manages and maintains a 144-strand fiber infrastructure <br /> providing high speed telecommunications to the community; and, <br /> WHEREAS,the fiber infrastructure provides reliable communications and connectivity <br /> to units of local government, educational facilities, state of Illinois agencies,museums, local <br /> businesses and other facilities; and, <br /> WHEREAS,the City continues to expand its fiber communications network throughout <br /> Decatur in its goal of providing access to all parts of the community; and, <br /> WHEREAS, The Sanitary District of Decatur, IL(SDD)is installing a 14-inch Forced <br /> Main pipe under Lake Decatur at Lost Bridge Road; and, <br /> WHEREAS,the City desires to use the same route SDD is utilizing for their 14-inch pipe <br /> install by piggy backing our 2-inch fiber conduit to it; and, <br /> WHEREAS, The city desires to utilize Bodine Electric for the additional work required <br /> who has been a provider and installer of fiber infrastructure in the City; and, <br /> WHEREAS, there exists a need for additional extensions of the fiber communications <br /> network to the east side of the City to provide fiber access to a firehouse, several schools, and <br /> other entities; and, <br /> WHEREAS,Bodine Electric is currently able to secure favorable prices and quick turn <br /> around on conduit and other materials needed for this fiber infrastructure extension; and, <br /> WHEREAS,the City desires to expedite the installation and extension of the network to <br /> the area described above and enter into an agreement for such without putting the work out for <br /> bid due to the time constraints and favorable agreement on price with Bodine Electric; and, <br /> WHEREAS, it was determined that it was in the best interest of the City to coordinate <br /> this project with the SDD's forced sewer main replacement and save nearly$400,000 in costs. <br /> NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF <br /> DECATUR, ILLINOIS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.